My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07908
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:08 PM
Creation date
10/5/2006 3:17:44 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
260
County
Jefferson
Community
Unincorporated Jefferson County
Basin
South Platte
Title
Major Drainageway Planning - Sanderson Gulch/Weir Gulch Volume I
Date
8/1/1972
Designation Date
12/1/1987
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />$IlCTIO" X <br /> <br />B. zuni St. to Federal Blvd. <br /> <br />SEQUENCE OF IMPLEMENTATION <br /> <br />C. Remaining portions of channel to be constructed in con- <br />junction with Parks Department developments if such <br />are forthcoming in the near future. If the Parks <br />Dcpartmcnt does not proceed with improvements, the <br />channels should be constructed as funds become avail- <br />able. <br /> <br />The following information presents a recommended sequence of <br />implementation for the Sanderson Gulch/Weir Gulch drainage <br />improvements recognizing that certain items of construction <br />have a higher priority due to their immediate effect on the <br />drainage basins. Also, some items must be complcted prior to <br />others since the functioning of one is directly dependent upon <br />the other. The recommended sequencing will allow for con- <br />struction of the project in phases as funding becomes available. <br /> <br />D. Installation of check dams in existing Parks developments. <br /> <br />7. Priority for channel improvement in Lakewood. <br /> <br />A. <br /> <br />Channel construction adjacent to Jewell Ave. including <br />the installation of street crossings of intersecting <br />streets. This may be accomplished prior to or at the <br />same time as Jewell is improved. <br /> <br />SANDERSON GULCH <br /> <br />1. Flood plain zone areas subject to inundation by 100 year <br />storm to prevent further encroachments on the flood plain <br />prior to construction of improvements. <br />2. The improvements to the cxisting storage reservoirs <br />should be accomplished to preclude a major catastrophe <br />occurring due to breaching of the dikes. These improve- <br />ments should consist of thc actual construction necessary <br />together with obtaining agreemcnts and/or ownership of the <br />reservoirs. The Green Gables entrance road and the con- <br />duits beneath it should be considered as a reservoir <br />since failure of the existing road fill might release d <br />considerable volume of stored water as a flood wave. <br /> <br />B. <br /> <br />Between Garrison St. and Kendrick Reservoir. <br /> <br />c. Between Smith Reservoir and Kendrick Reo;"'rvoir prior to <br />further develop~cnt of the area. <br /> <br />NORTH SANDERSON GULCH <br /> <br />1. <br /> <br />Flood plain zOne areas subject to inundation by a 100 year <br />storm to prevent further encroachment into the flood plain. <br />All improvements from Pierce St. to Florida Ave. essentially <br />function as a unit and should be constructed at one time. <br />IE construction is phased, it should begin at the lower end <br />and progress upstream. <br />1. ThA cnnduit in r'lorida Av". 5hould be installed to act as an <br />outlet for the Green Gables Park pond and to intercept <br />local drainage. <br /> <br />,. <br /> <br />3. Right-of-way for future improvements should be purchased <br />as soon as practical before cost of property increase. <br /> <br />4. Construction of the new street crossings at Arkansas, Zuni <br />and Xavier should be accompliShed on a high priority since <br />they are the source of major property damage. The entrance <br />to the Sheridan Blvd. culvcrt should be improved to develop <br />the full capacity of the exisling culvert. <br /> <br />4. Improvements of the Green Gables Park detention pond. <br />The detention pond improvements are last in order since <br />the storm sewer in Plorida Ave. must be constructed as an <br />outlet to the reservoir. <br /> <br />5. In Lakewood, the lower Jewell St. cros.ging, the conduit <br />between Wadsworth Blvd. and Jewell Avc. across the shopping <br />center parking lot, and the Garrison St. crossing should <br />be considered approximately equal priority, <br /> <br />WEIR GULCH <br /> <br />6. The following priority for construction of channels in Denver <br />is recommended: <br /> <br />l. Flood plain zon" areas subject to inundation by a 100 year <br />storm to prevent future encroachment on the flood plain. <br /> <br />A. Tennyson St. to Sheridan Blvd. <br /> <br />2. Regin property acquisition. <br /> <br />'" <br />-...~~- <br /> <br />-12l- <br />
The URL can be used to link to this page
Your browser does not support the video tag.