My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07884
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07884
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:13:04 PM
Creation date
10/5/2006 3:16:42 AM
Metadata
Fields
Template:
Floodplain Documents
County
El Paso
Community
Colorado Springs
Stream Name
Sand Creek - Center Fork
Basin
South Platte
Title
Flood Hazard Analyses
Date
6/3/1974
Prepared For
Colorado Springs, El Paso County
Prepared By
USDA Soil Conservation Service
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />....---_. <br /> <br />I <br />'I <br />I <br />I <br />I <br />I <br />.1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br /> <br />From sub-basin 1 <br />Time of arrival of peak is approximately 2 hours. <br /> <br />50 year frequency. .. 4,000 c.f.s. <br /> <br />100 year frequency . .. 5,000 c.f.s. <br />~ Standard Project Flood . 16,800 c.f.s. <br />From sub-basin 2 <br />Time of arrival approximately 50 minutes <br /> <br /> <br />50 year frequency storm. . . . .. 800 c.f.s. <br /> <br /> <br />Note that the peak discharge from sub-basin 2 passes the point of <br /> <br /> <br />interest 70 minutes ahead of the peak discharge from sub-basin 1. <br /> <br /> <br />By the time the peak from sub-basin 1 reaches the point of inte;est. <br /> <br /> <br />the flow from sub-basin 2 is negligible. <br /> <br />lUlOUIREMENTS FOR DRAINAGE FACILITIES AND BRIDGE LOCATION <br /> <br />Peak discharges from the basin enter Cimarrnn Hills under a CR~&P <br /> <br />RR bridge. The channel width at the bridge is 240 feet. Past t~e <br /> <br /> <br />RR bridge, the flood waters spread out and meande;. Channel improve- <br /> <br />ment is required to insure control of peak d~scharges. The channel <br /> <br />will cross four street&: Waynoka Road, Powers Boulevard, Palmer Pa;k <br /> <br />Boulevard, and Galley Road. <br /> <br />- <br />Hydrological, hydraulic, and cost considerations indicate that the ~St <br /> <br />efficient channel arrangement will be a wide 8 foot deep channel in the <br />upper reach and a narrower 8 foot deep channel in the lower reach. <br />Side walls of this chsnnel will be lined. CrosB se~ions of the two <br />channels are attached. A 350 foot transition will provide fo; SlllPO~tl <br />flows between the two sections. The 8 foot depth will allow 2.3 to 3.6 <br />feet of freeboard for Standard Project Flood discharges, <br /> <br />, <br />,. <br /> <br />'" <br />~. <br /> <br />4 <br /> <br />. <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.