My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07783
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07783
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:12:46 PM
Creation date
10/5/2006 3:12:38 AM
Metadata
Fields
Template:
Floodplain Documents
County
Rio Blanco
Community
Meeker
Stream Name
Sulphur Creek
Basin
Yampa/White
Title
Technical Addendum: Sulphur Creek Basin Hydrologic Investigation
Date
3/1/1992
Prepared For
Rio Blanco
Prepared By
CWCB
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />VI be used for flood control and floodplain management activities for the Sulphur Creek <br /> <br />. Basin. This reco=endation is based on the findings of the detailed investigation using <br /> <br />1991 basin conditions and the USDA-SCS TR 20 rainfall-runoff model. <br /> <br />TABLE VI <br />SULPHUR CREEK BASIN <br />1991 HYDROWGIC CONDmONS <br />FLOOD DISCHARGES <br />(in cubic feet per second) <br /> <br />FWOD FREOUENCY <br /> <br />Discharge <br /> <br />lo-year <br />25-year <br />50-year <br />l00-year <br />500-year <br /> <br />345 <br />690 <br />975 <br />1325 <br />2450 <br /> <br />It was discovered that the 1969, 1976, and 1977/1978 hydrologic studies previously <br />listed were performed under criteria/procedures which cannot be re-constituted. However, <br />. these respective criteria/procedures may have been state-of-the-art at the time of study. A <br />su=ary of the review of those studies is listed below: <br /> <br />o For the 1969 study, a study procedure was used by the SCS which has <br />been replaced by their TR-55 procedure. It is reco=ended this <br />method not be used for homogeneous basins which are larger than 5 <br />square miles. The Sulphur Creek Basin is 22.2 square miles. <br /> <br />o For the August, 1976 study, a hybrid procedure was used which <br />included portions of a Bureau of Reclamation procedure and basin <br />parameters from the SCS's 1969 study. It is difficult to determine how <br />the frequency values were computed. <br /> <br />o The June, 1978 study was prepared in draft form in April, 1977. There <br />is some comparability of the study procedure described in that draft to <br />the SCS TR 20 model. However, a number of the input parameters <br />are referenced to the 1969 study. Some changes were made after the <br />April, 1977 draft. Those changes appear in the floodplain study itself. <br />No final hydrology report could be located. Since the final report can <br />!!Q1 be retrieved, it is difficult to determine the study procedure. <br /> <br />. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.