Laserfiche WebLink
<br />I <br />I <br />I <br />'I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. In general, there has been no construction within the floodplain. There have been some <br />minor projects, but no major projects. <br /> <br />. They do not have any flooding problems that aren't expected. <br /> <br />. The City requires that all new developments do a drainage study which addresses floodplains <br />and make modifications to floodplain mapping if required. <br /> <br />. She will send in the designation request letter. <br /> <br />Sheridan <br />. Mr, Steve Thomas, Building Official, was contacted regarding the designation. <br /> <br />. He is not aware of any construction in the floodplain. There is a proposed project in Bear <br />Creek at FederaI/Hampton. <br /> <br />. The City is mostly residential which is out of the floodplain. There is no new development <br />within the City. <br /> <br />. He will discuss submitting the request letter with the City Manager. <br /> <br />~ <br /> <br />arapahoe_co_mtngrpl.doc <br />April 30, 2001 <br /> <br />3013 <br />