Laserfiche WebLink
<br />. . <br /> <br />Table 1 <br />Page 2 of 4 <br /> <br />Power Repayment Study Notes <br />Rio Grande Project <br />Final Current Power Repayment Study <br />Fiscal Year 1985 <br /> <br />Columns 1 and 30: These columns show the study year. "0" is the year <br />when the first feature of the project went into service. <br /> <br />Columns 2 and 29: These columns show the fiscal years. For the years <br />1940 through 1975, the fiscal year is July. 1 through June 30. The <br />year 1976 includes the 3-month transition periOd of July 1, 1976 <br />through September 30, 1976. After 1976, the fiscal year is October 1 <br />through September 30. <br /> <br />Column 3: The total revenue is obtained from sales of firm energy <br />and capacity, sales of nonfi rm energy, transmission service through <br />FY 1979, charges for project irrigation water through FY 1983, and <br />other mi sce 11 aneous revenues. Hi stori ca lly, power revenues were used <br />to pay multipurpose operation and maintenance (O&M) costs not met by <br />the sale of water to the water users. Beginning in FY 1984, the water <br />users began payi n9 the full amount of the multipurpose O&M allocated <br />to them and water revenues wi 11 no longer be shown. Power rates for <br />historical sales are as follows: <br /> <br />Fi rm Power Rates <br /> <br />Rate Demand Energy <br />Effective Charge Charge Amounts <br />1940-1949 $1.25/kW-month 8.0 mi lls/kWh Fi rst 50,000 kWh <br /> 6.0 mills/kWh Next 50,000 kWh <br /> 5.0 mi lls/kWh Next 200,000 kWh <br /> 4.0 mi lls/kWh Next 700,000 kWh <br /> 3.0 mills/kWh Over 1,000,000 kWh <br />May 1, 1949 $1.00/kW-month 4.5 mi lls/kWh Fi rst 250 kWh/kW <br /> 4.0 mi lls/kWh Over 250 kWh/kW <br />Apri 1 1974 $1.55/kW-month 4.5 mi lls/kWh <br /> Compos ite_ Rates <br />Apri 1 1978 $2.13/kW-month 6.0 mi lls/kWh 11.01 mi lls/kWh <br />April 1979 $2.72/kW-month 7.0 mi lls/kWh 13.4 mi lls/kWh <br />April 1980 $3.20/kW-month 8.5 mi lls/kWh 16.03 mi lls/kWh <br />Sept. 1982 $4.555/kW-month 10.72 mi lls/kWh 21.9 mi lls/kWh <br />Sept. 1983 $5.74/kW-month 13.50 mi lls/kWh 27.0 mills/kWh <br />Oct. 1984 $6.545/kW-month 15.45 mi lls/kWh 30.85 mi lls/kWh <br /> Non Fi rm Rates <br />Oct. 1984 22.00 mills/kWh <br /> 28 <br /> <br />------ .. <br />