Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I. Introduction <br /> <br />The Town of Crook has experienced excessive infiltration to the sewer system and generally <br />poor underground drainage due to a high water table. The Town wishes to have an underground <br />drainage system designed and constructed. Kiowa Engineering Corporation is very interested in <br />providing design services to the Town. The proposed system will consist of plastic underdrain <br />pipe located in the Town streets, a pump station and discharge piping to an existing <br />drainageway. <br />II. Scope of Services <br /> <br />The proposed scope of services is outlined in the Scope of Services prepared by the Colorado <br />Water Conservation Board and restated below: <br /> <br />I. Provide engineering services including the preparation of plans and <br />specifications, bid documents and bid recommendations to the Town Council, The <br />underdrain system will be designed in accordance with the U.S. Bureau of <br />Reclamation's design procedures for underground drainage. The design will also <br />include a "package" pump station with pre-engineered wet well and dry well. <br /> <br />2. Provide centerline profile survey for the proposed underdrain route. Also <br />provide permanent monumentation for the alignment that can be recovered during <br />construction. Survey elevations will be tied to the vertical datum of the ditch plans. <br /> <br />3. Provide Right-of-Way information to the Town. The RO,W. map will be based <br />on County records and shown on a USGS base map, Necessary easements and property <br />lines will tied to the centerline stationing of the underdrain system. <br /> <br />4. Design a pump station with primary and secondary pumps, wet well, and <br />necessary instrumentation to fit the flow rate and lift needed to remove underground <br />water. The "dry well" of the pump station will probably consist of a "pre-engineered <br />package pump station. The wet well will be sized after determination of the estimated <br />flow rate and recommended cycling time for the pumps, Annual pumping costs for <br />electricity and maintenance will be estimated. Service life of the pUlnps will also be <br />estimated. <br /> <br />5. Select an alignment and design the outfall line from the proposed pump station to <br />the natural drainage path. <br /> <br />6. Prepare contract documents in accordance with item 6 of the Scope of Service <br />document provided by the Colorado Water Conservation Board. <br /> <br />7. Provide four sets of documents and plans to the Town. <br /> <br />8. Prepare construction cost estimate. <br /> <br />9, Assist the Town during the advertisement and bidding of the project according to <br />item 9 of the Scope of Service document. Kiowa will include the design prepared by <br />Muller Engineering as a separate bid schedule. <br />