<br />l8. Muller Engineering Company, Inc., Town of Frisco Study Area,
<br />Meadow Creek. Miners Creek. and Tenmile Creek, Scale 1:4.800,
<br />prepared by Landmark Mapping, Lakewood, Colorado, August 25, 1989
<br />
<br />Chow, Ven Te, Handbook of Apolied Hvdrology, New York: McCraw-
<br />Hill Book Company, 1964
<br />
<br />Chow, Ven Te, Open-Channel Hydraulics, New York: McGraw-Hill
<br />Book Company, 1959
<br />
<br />9.0 REVISION DESCRIPT~
<br />
<br />This section has been added to provide information regarding
<br />significant revisions made since the original Flood Insurance Study was
<br />printed. Future revisions may be made that do not result in the
<br />republishing of the Flood Insurance Study report. To assure that any
<br />user is aware of all revisions, it is advisable to contact the
<br />community repository of flood hazard data.
<br />
<br />9.l First Revision
<br />
<br />This study was revised on November 2, 1994, to show the effects
<br />of updated hydraulic analyses for Jug Creek, Meadow Creek, Miners
<br />Creek, No Name Creek, and Tenmile Creek. The analyses for this
<br />revision to Meadow Creek, Miners Creek, and Tenmile Creek were
<br />performed by Muller Engineering Company, Inc., Lakewood,
<br />Colorado, for the Federal Emergency Management Agency (FEMA),
<br />Contract No. EMW-91-C-3365. In addition, the analyses for the
<br />revisions to Jug Creek, No Name Creek, and a portion of Meadow
<br />Creek were performed by Robillard and Associates, Dillon,
<br />Colorado. As part of this revision, the conversion of the Flood
<br />Insurance Rate Map for the Town of Frisco, Colorado to the Map
<br />Initiatives Format was completed. In the Map Initiates Format,
<br />all base flood elevations, cross sections, and floodplain and
<br />floodway boundaries are shown on the Flood Insurance Rate Map.
<br />The flood insurance zone designations were changed to reflect the
<br />Map Initiatives Format. Areas previously shown as numbered Zone
<br />A were revised to Zone AE, Zone B was revised to Zone X (shaded),
<br />and Zone C was revised to Zone X (unshaded). In addition, all
<br />Flood Insurance Zone Data Tables were removed from the Flood
<br />Insurance Study report and all zone designations and reach
<br />determinations were removed from the profiles.
<br />
<br />On June 18 and 19, 1990, initial Consultation and Coordination
<br />Officer (CCO) meetings were held with representatives of FEMA,
<br />Summit County, the Town of Frisco, the Colorado Water
<br />Conservation Board, and the study contractor. At this meeting
<br />the streams requiring detailed study were identified. An
<br />intermediate CCO meeting was held on September 23, 1992, to
<br />present the preliminary results of this revision. This meeting
<br />was attended by representatives of FEMA, Summit County, the Town
<br />of Frisco, the Colorado Water Conservation Board, and the study
<br />contractor.
<br />
<br />l6
<br />
|