Laserfiche WebLink
<br />those areas in the flood plain that are to be reserved for passing <br /> <br /> <br />future floods (the floodway) and those that can be developed if no <br /> <br /> <br />practicable alternative exists (flood fringe). <br /> <br />FLOOD PREPAREDNESS PLANNING <br /> <br /> <br />This measure consists basically of flood warning, flood warning <br /> <br /> <br />dissemination, emergency response, post-flood recovery and <br /> <br /> <br />reoccupation of flooded areas, and continuous flood preparedness plan <br /> <br /> <br />management, The following components are to be considered in flood <br /> <br /> <br />preparedness planning, <br /> <br />Flood Yarning <br /> <br /> <br />Collection of data <br /> <br /> <br />Transmission of data <br /> <br /> <br />Receipt of data <br /> <br /> <br />Organization and display of data <br /> <br /> <br />Prediction of timing a~d magnitude <br /> <br />, <br />" <br />.. <br /> <br />of flood events <br /> <br />.' <br />.' <br />.' <br /> <br />Flood Yarning Dissemination <br /> <br /> <br />Determination of affected areas <br /> <br /> <br />Identification of affected parties <br /> <br /> <br />Preparation of warning messages <br /> <br /> <br />Distribution of warning messages <br /> <br />Emergency Response <br />Temporary evacuation <br />Search and rescue <br /> <br />Mass care center operations <br />Public property protection <br />Flood fight <br /> <br />Maintenance of vital services <br /> <br />26 <br />