My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07354
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07354
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:33 PM
Creation date
10/5/2006 2:55:20 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Platte Center Nebraska
Basin
Statewide
Title
Flood Hazard Mitigation Study for Platte Center, Nebraska
Date
8/1/1991
Prepared For
US Army Corps of Engineers
Prepared By
Greenhorne & O'Mara, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Raising and extending the existing ring levee protecting southwest <br /> <br /> <br />Platte Center against flooding from Shell Creek "ould provide a <br /> <br /> <br />feasible solution for some of the residencs, however. The levee <br /> <br /> <br />alignment considered for this alternative is shown in figure 5, The <br /> <br /> <br />design used to develop the cost estimate was based on the surveyed <br /> <br /> <br />June 1990 flood high-water mark at the pumphouse plus 3 feet of <br /> <br /> <br />freeboard, resulting in an average levee height of 7 feet. The cost <br /> <br /> <br />of this levee is estimated at $102,700, with total annual costs and <br /> <br /> <br />benefits of approximately $8,990 and $10.210, respectively. The <br /> <br /> <br />resulting benefit-cost ratio is 1.14, A breakdown of che cost <br /> <br /> <br />estimate is shown in appendix C. <br /> <br />DIVERSION <br /> <br />,h <br />" <br /> <br />A structure to divert Elm Creek floodflows north and west of town <br /> <br /> <br />to Shell Creek "as also evaluated. The cost of over $831,000 and <br /> <br /> <br />corresponding benefit-cost ratio of only .63 make this a1ternacive <br /> <br /> <br />economically infeasible. Quantities used to obtain this cost estimate <br /> <br /> <br />are located in appendix C, <br /> <br />Ml1[ <br /> <br />A dam on a tributary north of Platte Center was' considered. <br />Unf~rtunately, it is not likely that a dam ~apable of eliminating the <br />.' <br /> <br />flood" hazard could be constructed for lEis~. .than $500.000 Which is <br /> <br /> <br />necessary in order to have a benefit-cost ratio of 1. 0 or greater. <br /> <br /> <br />As a result, a dam was considet'ed Co be an economically infeasible <br /> <br /> <br />alternative if Platte Center benefics only are concerned. Detailed <br /> <br /> <br />costs for this alternative were not developed. <br /> <br />- <br /> <br />22 <br />