Laserfiche WebLink
<br />I <br />I REAL ESTATE SUBTOTAL $22,880 <br />I 5 Hydrology Studies (Estimated by PM) <br />5,1 Provide surveys & water rights information on sand pit lakes, Hours 40 60 $2,400 Y <br /> 5,2 Provide surveys & data on interior drainage facilities as needed, Hours 32 60 $1,920 <br />I HYDROLOGY SUBTOTAL $4,320 <br />6 Flood Plain <br />I 6,1 Define property currently or projected to be in a FEMA program Hours 10 60 $600 Y <br /> FLOOD PLAIN SUBTOTAL $600 <br /> 7 Hydraulic Studies (Estimated by PM) <br />t Provide TIN or DTM data for RAS model & plotting flood <br />7,1 boundaries, Hours 80 60 $4,800 y <br /> Provide data on bridges that have changed since the '03 FIS <br />I 7,2 Study, Hours 12 60 $720 y <br /> Provide high water marks and other historical flood <br />7,3 documentation, Hours 56 60 $3,360 Y <br /> HYDRAULICS SUBTOTAL $8,880 <br />I 8 Geotechnical Studies (Estimated by PM) <br /> 8,1 Provide soils and design information on all existing levees, Hours 40 60 $2,400 Y <br />I 8,2 Provide available subsurface data within the project area, Hours 60 60 $3,600 <br /> GEOTECHNICAL SUBTOTAL $6,000 <br /> 10 Surveys and Mapping & GIS Support (Estimated by PM) <br />I 10,1 Provide appropriate raw Survey GIS data that will help with study, Hours 60 60 $3,600 Y <br />10,2 Provide existing GIS products that will assist with public meetings, Hours 12 60 $720 <br /> 10,3 Develop new GIS products for reports and meetings Hours 80 60 $4,800 <br />I 10.4 Registration and placement of Historic Photos Hours 12 60 $720 <br /> GIS AND SURVEYS SUBTOTAL $9,840 <br />I 14 Plan Formulation & Project Management (Est. by PM) <br />14,1 Decision Point 1 <br />14,1 Provide public meeting locations and support material. Rental 3 500 $1,500 Y <br /> 14,1 Participate in ail project related meetings, Hours 72 60 $4,320 Y <br />I 14,1 Development of the Public Involvement Plan, Hours 40 60 $2,400 Y <br />14,1 Plan Formulation, Hours 32 60 $1,920 y <br /> 14.2 Study correspondence and documentation, Hours 36 60 $2,160 Y <br />I 14,2 S&A@10% Hours 18 66 $1,188 y <br />14,2 Travel Trips 6 600 $3,600 y <br /> Phase 1 Subtotal $17,088 <br />I 14,2 Remainder of Feasibility Study <br /> 14,2 Provide public meeting locations and support material. Rental 3 500 $1,500 <br />I 14,2 Participate in all project related meetings, Hours 72 60 $4,320 <br />14,2 Development of the Public Involvement Plan, Hours 40 60 $2,400 <br /> 14,2 Plan Formulation, Hours 32 60 $1,920 <br /> 14,3 Review and editing of the Feasibility Report, Hours 40 60 $2,400 <br /> 14,3 Study correspondence and documentation, Hours 48 60 $2,880 <br /> 9 <br /> <br />