My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07306
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:24 PM
Creation date
10/5/2006 2:52:17 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Greeley
Stream Name
Cache La Poudre River
Basin
South Platte
Title
Cache La Poudre River General Investigation Study, Greeley, CO
Date
5/1/2005
Prepared For
Greeley
Prepared By
USACE, Omaha, NE
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />NED (National Economic Development) -- When applied to a flood control solution plan, <br />it is the one that provides the greatest net benefit to the economy of the nation. <br /> <br />NEPA (National Environmental Policy Act) - A collection of Federal laws and <br />procedures governing the protection of endangered species and other impacts of a water <br />project on the environment. <br /> <br />NWD (Northwestern Division) - The office to which the Omaha District reports to in the <br />chain of command. <br /> <br />PCA (Project Cooperation Agreement) - The documents signed before proceeding into <br />the preparation of plans and specifications and beginning construction. <br /> <br />PDT (Product Delivery Team) -- The group of Corps and Sponsor personnel that are <br />working on the Feasibility Study. <br /> <br />PED (Preconstruction Engineering and Design) - Preparation of plans and specifications, <br />that follows a Feasibility Study and precedes project construction, <br /> <br />PHA (Preliminary Hazard Analysis) - A preliminary list of hazards that is to be <br />developed by the PM and the Local Sponsor for use by those individuals working on the <br />project site. <br /> <br />PM (Project Manager) - The individuals at the Corps and at the Sponsor who have <br />responsible charge over the completion of the Feasibility Study, <br /> <br />PMP (Project Management Plan) - A working document for Corps Civil Works Projects <br />that provides details on the project and team, It is the portion of the FCSA contract that <br />spells out the scope of work and cost estimate for the phase of study, <br /> <br /> <br />PRB (Project Review Board) - An executive committee at the District that meets <br />monthly to review the progress ofprojects assigned to the District. <br /> <br />Program Control- Funds Managers for the Corps of Engineers, <br /> <br />QCP (Quality Control Plan) - A plan developed to make sure that quality review <br />milestones are met. <br /> <br />QCR (Quality Control Review) - A project review performed by the PDT prior to <br />completing the feasibility report, <br /> <br />SACCR (project Schedule And Cost Change Report) - A required report that must be <br />filed to Division in order to get permission to change the project funding or schedule, <br /> <br />SOHM (Safety and Occupational Health Manager) - District official that helps the PDT <br />develop any needed safety plans, <br /> <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.