<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />number of procedures are in place through this PMP to assist in reducing the risk of <br />unrealistic scope, cost estimates, schedule changes and study resources, These will help <br />to maintain schedule within cost limitations and under the project manager's span of <br />control authority, Non-performance of a key study task by a member of the PDT is of <br />concern, but if identified early on, can be remedied by contracting for the services, <br />Contingency funds are also budgeted, A risk also exists in that either one of the <br />signatories to the FCSA, for various reasons, may decide to terminate the agreement. <br />This would result in wasted Federal resources, unless another partner can be located, <br />Controls that help reduce risk of study termination are frequent meetings and contacts <br />with the Sponsor, the monthly PRB meetings held at the Omaha District, project <br />managers working at both the District and local levels, and vertical coordination meetings <br />with HQ and NWD, <br /> <br />11. SAFETY PLAN <br />The Corps, the Sponsor and their contractors will comply with all local, State and Federal <br />safety rules and regulations to protect the safety and health of employees engaged in <br />official study activities, Appropriate safety reviews and considerations will be <br />implemented throughout the life cycle of this project from study phases through <br />construction, During the study phases a major safety consideration is identifying <br />potential hazards relative to site conditions, including water safety concerns, driving <br />safety, climate related hazards, presence of dangerous wildlife, vectors, and plants, and <br />needed safety equipment. Appropriate safety briefings prior to any field activity, such as <br />site visits, will be conducted to apprise groups of any potential hazards, [nitially the PM <br />and the Sponsor will generate a list of potential hazards and conduct a Preliminary <br />Hazard Analysis (PHA), More detailed safety plans may be developed for specific <br />contract work, The PMP will be amended as needed to incorporate these plans. <br /> <br /> <br />a, SAFETY SUPPORT: The Omaha District PM will coordinate with the Omaha <br />District Safety and Occupational Health Manager (SOHM), The SOHM has overall <br />responsibility for planning, organizing, overseeing, and evaluating the Safety and <br />Occupational Health Program within the Omaha District. The SOHM will assist the PM <br />in developing the Safety and Occupational Health Plan (SOHP) for the project. The <br />SOHM or personnel from CENWO-ED-G reviews the Site Safety and Health Plan <br />(SSHP), if required. The SOHM or staff conducts periodic safety surveys, inspections, <br />evaluations of all work and procedures associated with the project to include operational <br />procedures, programmatic safety and occupational health requirements, environmental <br />hazardous that could be encountered, construction, recreational and public protection <br />from safety hazards, and personal protective equipment requirements. The SOHM <br />ensures compliance with all applicable safety regulations and provides support to the PM <br />for overall safety on the project site, <br /> <br />b, SAFETY REQUIREMENTS: Safety is our primary concern for the activities on- <br />site. A Government representative is required to monitor contractor activities from a <br />quality assurance viewpoint. This includes the contractor's safety program, Under the <br />terms of the contract, FAR 52,212-3 Stop-Work Order clause of the basic contract, the <br /> <br />23 <br />