My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07306
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:24 PM
Creation date
10/5/2006 2:52:17 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Greeley
Stream Name
Cache La Poudre River
Basin
South Platte
Title
Cache La Poudre River General Investigation Study, Greeley, CO
Date
5/1/2005
Prepared For
Greeley
Prepared By
USACE, Omaha, NE
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 7, Sponsor Team Members <br /> <br /> <br />NAME ORG TITLE PHONE E-MAIL <br />David Wells Greeley Civil (970) welIsdtmci. greelev ,co, us <br /> Engineer 350-9796 <br />Steve Bagley Greeley Deputy City (970) baglevstmci, greelev .co. us <br /> Engineer. 350-9792 <br />John Briggs Greeley Public Works (970) <br /> 336-4156 <br />Greg Flebbe Greeley (970) <br /> 350-9782 <br />Ron Hoagland Greeley Storm Water (970) <br /> Management 336-4031 <br />Karen Scopel Greeley Communi cat. (970) <br /> Division 350,9783 <br />Todd Greeley Water Res. (970) williamttmci.greeley,co,us <br />Williams Management 350-9291 <br />Royce Greeley GIS (970) <br />Simpson Administrator 350-9791 <br />Terri Kohls Greeley Storm Water (970) <br /> Management 336-4072 <br />John Kolanz Greeley City Attorney (970) <br /> 350-9757 <br />Bert Greeley Stormwater (970) <br />Lieautaud Management. 336-4121 <br />Joe Kunovic Greeley Water PolIut. (970) <br /> Control 350-9363 <br />Tom Welch Greeley Island Grove (970) <br /> Park Mangr. 351-7123 <br />Kim Ogle Weld Co Planning (970) kogletmcO,weld,co.us <br /> 353-6100 <br />Larry Lang Colorado WC Board (303) Larrv ,lang(q1state,co, us <br /> 866-3441 <br />Larry Rogstad Colorado Division of (970) <br /> Wildlife 352-2143 <br /> <br />8. QUALITY CONTROL PLAN AND OBJECTIVES <br />Quality study management and independent technical review are integral to the PMP. An <br />overriding objective is to integrate both while completing the feasibility study within a <br />reasonable time period and within budget. A detailed quality control plan (QCP) is <br />provided in Appendix C that establishes processes and criteria for development of a <br />quality product that meets or exceeds customer expectations, Quality review milestones <br />for important study decisions in the planning process will be provided in the Appendix. <br />These are important so that the technical results can be relied upon in further work. The <br /> <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.