<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 4. Feasibility Study Cost Estimate <br />FEASIBILITY STUDY COST ESTIMATE SUMMARY <br />Federal Cost, Share (50%): $734,050 <br />Non-Federal Cost-Share (50%): $734,050 <br />Cash $607,353 <br />In-Kind Services $126,697 <br />Total Study Cost: $1,468,100 <br /> <br />DECISION POINT I COST ESTIMATE SUMMARY <br />Federal Cost-Share (50%): $242,000 <br />Non-Federal Cost-Share (50%): $242,000 <br />Cash $189,420 <br />In-Kind Services $52,580 <br />Initial phase Study Cost: $484,000 <br /> <br />* The In-Kind Services have not yet been negotiated, so those figures are estimated, <br /> <br /> <br /> Table 5. Cost -Shared Feasibility Study <br />Or anization Tbru FY05 FY06 FY07 FY08 Total FY08 ed <br />Federal $80,000 $316,000 $300,000 $38,409 $734,409 $250,000 <br />Non-Federal <br />S onsor $80,000 $316,000 $300,000 $36.409 $734,409 <br />Cash $80,000 $260,841 $244,841 $2:1,031 $607,712 $250,000 <br />In, Kind Services $0 $55,160 $55,160 $16,378 $126,697 $0 <br />Total Stud Cost: $160,000 $632,000 $600,000 $76,818 $1,468,818 $500,000 <br /> <br />* Assumes PED Phase, with Feasibility Study Complete in FY08, <br /> <br />In-kind services were identified that could be done by the city of Greeley in place of a <br />cash payment. The tasks have been estimated but have not been negotiated with the city <br />of Greeley, They were derived from tasks noted in the individual cost estimates prepared <br />by members of the study team and from experience on similar previous studies, <br />Derivation of In-Kind Service tasks shall be done jointly by the city of Greeley and the <br />Corps of Engineers. <br /> <br />4. CRITICAL ASSUMPTIONS AND CONSTRAINTS <br /> <br />A major assumption is that feasibility study funding will be in place to execute tasks that <br />will be developed and identified in the detailed study schedule, For this to happen, both <br /> <br />14 <br />