Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />'. <br />. <br />. <br />'. <br />. <br />. <br />. <br />. <br />I. <br />i. <br />. <br />I. <br />i. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Bosley Wash Drainage Master Plan Phase I: Watershed Floodplain Delineation <br />.,c- iI!Il !i\J!_-E~,('fir'0I"" "';;;;~;"",.wy'(;:;S~t#0"'s';;;;;,";":;~,, ",' 'c'; ':, <br />- u ~ 'd<1l. ~ ,.,.',~,-" '. :"_,0i];fii$JfJlir;f..~",4S","^~"~~\cA-A~''''''''''''',;, ';C'" -,,,', 7~,,__-,' 't" . "M"'" . <br /> <br />1.1 Define Needs and Collect Information <br /> <br />Representatives of the County, local sponsors, and local residents were contacted concerning the <br />nature and extent of the existing flooding issues within the basin, A by, product of this task was <br />to communicate to the local residents the overall direction of this project and to solicit their <br />feedback and involvement. These tasks entailed an initial meeting with the County and project <br />sponsors followed by a public meeting where HDR presented the general scope of the project <br />and discussed basin issues, Photos taken during the site visits, and those provided by the <br />sponsors, are included in Appendix 1. <br /> <br />1.2 Data ColI~ction and Mapping <br /> <br />HDR collected, compiled and evaluated the available existing material related to flooding in the <br /> <br />Bosley Wash Basin, Sources of infonnation include previous studies and reports, GIS <br /> <br /> <br />infonnation, future growth projections and land use development infonnation, typical cross- <br /> <br />sections from topographic data, and water quality data. Sources are listed in the Bibliography <br /> <br />section, <br /> <br />1.3 Hydrologic Model Development <br /> <br />A model was developed that quantified stonnwater hydro graphs, volumes and flow rates within <br /> <br />the Bosley Wash Basin under existing conditions, The County and GJDD concluded that the <br /> <br />existing land use would remain unchanged for the foreseeable future; so the representation of <br /> <br />future land use would be an inconsequential change, Subbasins were delineated based on <br /> <br /> <br />mapping provided by the County and GJDD. Other infonnation used in the model development <br /> <br />included site visits, interviews, land use, soil types, and hydraulic structure conditions, A <br /> <br />hydrologic model was developed using HEC,HMS (V.S, Anny Corps of Engineers, 1999), <br /> <br />Runoff hydrographs were generated for the 2, 5, 10,50, 100, and 500-year events, HDR used <br /> <br />the National Oceanic and Atmospheric Administrations Atlas 2 (NOAA, 1973) precipitation data <br /> <br />for all hydrologic evaluations. <br /> <br />- <br />..~;:i~4' <br /> <br />'-~~'l~; <br /> <br />,.j"~._r.,~~~~~raX;*%lf?',~'?{~~-'~ ' - -."".. <br /> <br />e ' '-", '-'€j <br /> <br />Page 2 <br /> <br />@'1 <br />