My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07257
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:16 PM
Creation date
10/5/2006 2:50:33 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Community
Arapahoe County
Stream Name
Piney Creek
Basin
South Platte
Title
LOMR - Affected Panel 08005C 0480 J, 08005C 0485 J - Case No. 97-08-360P
Date
11/3/1997
Prepared For
Arapahoe County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />. <br /> <br />2 <br /> <br />The following table is a partial listing of existing and modified BFEs: <br /> <br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet)* <br /> <br />Approximately 2,300 feet downstream of South Parker Road <br />Approximately 1,150 feet downstream of South Parker Road <br />Approximately 275 feet downstream of South Parker Road <br /> <br />5,625 <br />5,633 <br />5,638 <br /> <br />5,626 <br />5,635 <br />5,640 <br /> <br />*Referenced to the National Geodetic Vertical Datum, rounded to the nearest whole foot <br /> <br />Public notification of the proposed modified BFEs will be given in The Villager on or about November 20 and <br />November 27, 1997. A copy of this notification is enclosed. In addition, a notice of changes will be published <br />in the Federal Register, Within 90 days of the second publication in The Villager, a citizen may request that <br />FEMA reconsider the determination made by this LOMR. Any request for reconsideration must be based on <br />scientific or technical data. All interested parties are on notice that, until the 90-day period elapses, the <br />determination to modify the BFEs presented in this LOMR may itself be modified. <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents and <br />mortgage lenders, your community will serve as a repository for these new data. We encourage you to <br />disseminate the information reflected by this LOMR throughout the community, so that interested persons, <br />such as property owners, local insurance agents, and mortgage lenders, may benefit from the information. <br />We also encourage you to prepare a related article for publication in your community's local newspaper. This <br />article should describe the assistance that officials of your community will give to interested persons by <br />providing these data and interpreting the NFIP maps. <br /> <br />We will not physically revise and republish the FIRM and FIS report for your community to reflect the <br />modifications made by this LOMR at this time. When changes to the previously cited FIRM panel(s) and FIS <br />report warrant physical revision and republication in the future, we will incorporate the modifications made <br />by this LOMR at that time, <br /> <br />The floodway is provided to your community as a tool to regulate floodplain development Therefore, the <br />floodway modifications described in this LOMR, while acceptable to FEMA, must also be acceptable to your <br />community and adopted by appropriate community action, as specified in Paragraph 60.3(d) of the NFIP <br />regulations . <br /> <br />This LOMR is based on minimum floodplain management criteria established under the NFIP. Your <br />community is responsible for approving all floodplain development, and for ensuring all necessary permits <br />required by Federal or State law have been received. State, county, and community officials, based on <br />knowledge of local conditions and in the interest of safety, may set higher standards for construction in the <br />SFHA. If the State, county, or community has adopted more restrictive or comprehensive floodplain <br />management criteria, these criteria take precedence over the minimum NFIP criteria. <br /> <br />The basis of this LOMR is, in whole or in part, a channel-modification project NFIP regulations, as cited <br />in Paragraph 60.3(b)(7), require that communities ensure that the flood-carrying capacity within the altered <br />or relocated portion of any watercourse is maintained. This provision is incorporated into your community's <br />existing floodplain management regulations. Consequently, the ultimate responsibility for maintenance of the <br />modified channel rests with your community. <br />
The URL can be used to link to this page
Your browser does not support the video tag.