My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07117
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:53 PM
Creation date
10/5/2006 2:45:43 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Stream Name
South Platte
Basin
South Platte
Title
Union Avenue Boat Drop
Date
1/1/1983
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Easement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />,-"'-- <br /> <br />-, <br /> <br />. <br /> <br />. <br /> <br />BROWN DITCH WEIRS BOAT CHUTES <br />WORK PLAN <br />PAGE 2 <br /> <br />v d. Utilize expert boaters, including Mr. Gary M. lacy and two other <br />prominent kayakers and river raft boaters, for hydraulic layout, <br />chute characteristic and best layouts of chute configuration. <br /> <br />if e.. Prepare plan and profile drawings of three to six alternative lay- <br />outs with evaluations of each; evaluation to include hydraulic engi- <br />neering and boater ratings. Each alternative will be ranked and <br />safety ratings will be included. <br /> <br />/ f. The two best alternative plans will be selected in conjunction with <br />ewCB personnel; however, in selecting the alternative, final cri- <br />teria will provide major emphasis on navigability. <br /> <br />We propose to combine the evaluation phase of the assignment with the <br />hydraulic analysis as a matter of schedule facilitation. <br /> <br />_ 3) EVALUATION <br /> <br />~ a. Water surface profi les wi 11 be prepared for the two best alternative <br />designs for the range of flows determined in work item #1 above, <br />River Hydrology. <br /> <br />-' b. Evaluation will be conducted based on: <br /> <br />(1) Hydraulic and boater criteria <br />(2) Navigability (safety) <br />(3) Rescue compatibility <br />(4) Reconnaissance cost estimates and ease of construction <br />(5) Appearance <br />(6) Operation and maintenance <br />(7) Enjoyment and boater interest <br />(8) Stability <br /> <br />c. Review final results with the Colorado Water Conservation Board. <br /> <br />~- .----- <br /> <br />4. PRELIMINARY DESIGN <br /> <br />The selected alternative will be analyzed as to hydraulics and layout <br />for this preliminary design phase. <br /> <br />a. Prepare preliminary plan and profile drawings. <br /> <br />b. Prepare operational scenarios. <br /> <br />c. Prepare 'preliminary cost estimates. <br /> <br />/<.~--- <br />~ d. Submit for approval by CWClf~> <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.