My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07105
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:51 PM
Creation date
10/5/2006 2:45:16 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Arvada
Stream Name
Hidden Lake
Basin
South Platte
Title
Hidden Lake Major Drainageway Planning Study
Date
6/1/1975
Prepared For
Adams County
Prepared By
HYDRO-TRIAD, LTD.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />iii <br /> <br />. <br /> <br />Since the improvements for a particular reach are essentially independent <br />of the improvements in the other reaches, the priorities of construction can <br />depend solely on the benefits obtained from that reach and the desires of <br />Adams and Arvada. However, due to the present development plans and the <br />immediate benefits that can be accrued, the reach from Hidden Lake to Clear <br />Creek is recommended for construction first. The Hidden Lake dam and spill- <br />way should be constructed next. The Bates Lake Planning Basin improvements <br />can be constructed according to the priorities within Arvada since the benefits <br />from the improvements can still be realized even with increased construction <br />and financing costs. <br />Certain legal questions and the actual administration of Hidden Lake need <br />to be resolved, at least in concept, prior to any actual construction on <br />segments of the Hidden Lake Planning Basin. <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.