My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06925
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06925
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:22 PM
Creation date
10/5/2006 2:36:14 AM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Greeley
Stream Name
Cache La Poudre River
Basin
South Platte
Title
Master Floodway Planning
Date
3/11/1983
Prepared For
Greeley
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SLA will meet initially and at regularly scheduled meetings thereafter <br /> <br /> <br />with representatives of the City, CWCB, and members of the floodplain panel to <br /> <br /> <br />ensure timely completion of the project that addresses all of the City's con- <br /> <br /> <br />cerns. In the initial meeting, SLA will present a detailed work schedule for <br /> <br /> <br />review by the City, CWCB, and members of the floodplain panel. A coordination <br /> <br /> <br />link will be established at the meeting to ensure proper coordination. <br /> <br /> <br />In addition to regularly scheduled project meetings, SLA will attend any <br /> <br /> <br />special meetings, requested by the City or the floodplain panel, including <br /> <br /> <br />public hearings, presentations to the City Council, meetings with FEMA offi- <br /> <br /> <br />cials, or other meetings necessary to ensure a successful project. <br /> <br /> <br />In all the meetings, SLA will be prepared to present the project progress <br /> <br /> <br />reports or to answer questions related to the project. SLA is willing to <br /> <br /> <br />coordinate with the City and provide the expertise to develop a most practical <br /> <br />"Plan of Improvement" for this project. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />4. <br /> <br />A. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />4 <br /> <br />g. <br /> <br />Develop conceptual design for each alternate plan considered in <br />sufficient detail to facilitate improvement costs. <br /> <br />h. <br /> <br />Evaluate all alternate plans developed and recommend a "Plan <br />of Improvement". <br /> <br />L <br /> <br />Prepare the "Plan of Improvement" in sufficient detail to faci- <br />litate the development of the final design and construction of <br />the improvement and to allow a detailed cost estimate. <br /> <br />j. <br /> <br />Prepare a set of administrative maps at a scale of ," = '00' <br />showing the 'OO-year recommended floodway on mylar. <br /> <br />k. <br /> <br />Prepare a final report documenting all findings of this pro- <br />ject. The final report will be organized as outlined in the <br />CWCB specifications. <br /> <br />1. <br /> <br />Prepare a technical addendum documenting the technical infor- <br />mation and data developed through this study. <br /> <br />m. <br /> <br />Provide close coordination with the City, CWCB, and members of <br /> <br />the floodplain panel throuqhout the study. <br />:;.-" S, .....~".:r 0/-0 11-'>~1t:.... o,~i'>>,:/I .....{Iuns. <br /> <br />Work Plan <br /> <br />Project Coordination <br />
The URL can be used to link to this page
Your browser does not support the video tag.