Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />24 <br /> <br />Erosion and Sedimentation Study for Toll Gate Creek, Aurora, Colorado <br /> <br /> <br />Toll Gate Creek flows in a northerly direction through the City of <br /> <br /> <br />Aurora, Colorado, to its discharge point at Sand Creek. The area of the basin <br /> <br /> <br />is approximately 39 square miles. Due to severe flood damage in the past and <br /> <br /> <br />increasing urban development between Sixth Avenue and Sand Creek, a chan- <br /> <br /> <br />nelization design has been proposed to reduce the flood potential. Such a <br /> <br /> <br />design must consider the erosion and sedimentation problems that may develop. <br /> <br /> <br />This study was conducted to establish design criteria for the proposed <br /> <br /> <br />channelization to minimize the erosion and sedimentation problems. Among the <br /> <br /> <br />potential problems are bank erosion and lateral migration, channel bed degra- <br /> <br /> <br />dation, low-flow channel development, and local scour at bridges. By <br /> <br /> <br />reviewing the history of Toll Gate Creek and analyzing the "as-is" conditions, <br /> <br /> <br />a qualitative determination of the response of Toll Gate Creek to the proposed, <br /> <br /> <br />channelization was made. This was then verified by the equilibrium slope <br /> <br /> <br />method. This method determines the design channel bed slope at which the <br /> <br /> <br />channel is in equilibrium. In addition, the response of the proposed chan- <br /> <br /> <br />nelization to future urbanization was analyzed. <br /> <br /> <br />The results of the study included recommendations on design channel <br /> <br />slope, channel geometry, type of bank protection, depth of bank protection, <br /> <br />and required grade control structures. <br /> <br />Project Period: September 1981 through December 1981 <br /> <br />Project Budget: $20,000 <br /> <br />Reference: Mr. Douglas C. Weber, P.E. <br />Project Engineer <br />Centennial Engineering, Inc. <br />15000 West 64th Avenue <br />Arvada, CO 80004 <br />(303) 420-0221 <br />