My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06869
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:11 PM
Creation date
10/5/2006 2:34:25 AM
Metadata
Fields
Template:
Floodplain Documents
County
Eagle
Community
Red Cliff
Basin
Colorado Mainstem
Title
Flood Insurance Study - Town of Redcliff
Date
12/1/1979
Prepared For
Redcliff
Prepared By
FEMA
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />FLOOD INSURANCE STUDY <br /> <br />1.0 INTRODUCTION <br /> <br />1.1 Purpose of Study <br /> <br />The purpose of this Flood Insurance Study is to investigate the <br />existence and severity of flood hazards in the Town of Redcliff, Eagle <br />County, Colorado, and to aid in the administration of the National <br />Flood Insurance Act of 1968 and the Flood Disaster Protection Act of <br />1973. Initial use of this information will be to convert Redcliff <br />to the regular program of flood insurance by the Federal Insurance <br />Administration. Further use of the information will be made by <br />local and regional planners in their efforts to promote sound land <br />use and flood plain development. <br /> <br />1.2 Coordination <br /> <br />Streams requiring detailed study were identified at a meeting attended <br />by representatives of the study contractor, the Federal Insurance <br />Administration, the Colorado Water Conservation Board, and Eagle <br />County on June 9, 1977. Results of the hydrologic analyses were <br />coordinated with the Colorado Water Conservation Board and the <br />Federal Insurance Administration. <br /> <br />rl'he results of this study were reviewed at a final community coordi- <br />nation meeting held on April 2, 1979. Attending the meeting were <br />representatives of the Federal Insurance Administration, the study <br />contractor, the Colorado Water Conservation Board, and the town. <br />No problems were raised at the meeting. <br /> <br />1.3 Authority and Acknowledgments <br /> <br />The source of authority for this Flood Insurance Study is the <br />National Flood Insurance Act of 1968, as amended. <br /> <br />The hydrologic and hydraulic analyses for this study were performed <br />by Gingery Associates, Inc., for the Federal Insurance Administration, <br />under Contract No. H-4549. 'Phis work, which was completed in December <br />1978, covered all significant flooding sources affecting the Town of <br />Redcliff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.