My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06826
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:05 PM
Creation date
10/5/2006 2:32:21 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
National Economic Development Procedures Manual-Urban Flood Damage
Date
3/1/1988
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Freeboard is a safety factor to account for unknowns such as wave action, <br /> <br />Levees are generally credited for preventing one half the damages in the <br /> <br />freeboard range, <br /> <br />2) The protection offered by any structure is dependent on its <br /> <br />structural integrity, A project can only be considered effective insofar <br /> <br />as it has structural integrity, <br /> <br />An existing levee cannot be considered as offering any protection at <br /> <br />elevations above which inadequate structural quality would cause it to <br /> <br />fail, Likewise, as discussed in Chapter VIII, there can be no benefits <br /> <br />claimed for flood damage reduction attributable to replacement or <br /> <br />rehabilitation of such structures unless it can be shown they are <br /> <br />structurally deficient, Channels and interior drainage ditches should be <br /> <br />sufficiently maintained so that sediment, logjams, and debris are not <br /> <br />likely to cause a significant reduction of capacity..:., Structural <br /> <br />investigations should indicate if levees are free of uneven settlement, <br /> <br />inadequate seepage control, or deteriorated construction material, <br /> <br />STEP TWO: SELECT PLANNING REACHES <br /> <br />Definition. The reach is the primary unit of plan formulation. The <br /> <br />river length and affected tributaries are divided into "reaches" <br /> <br />throughout which the relation between discharge and stage remains <br /> <br />practically constant, and into zones where development or use changes <br /> <br />appreciably with stage, Frequency, flow, stage and damage data are used <br /> <br /> <br />for each reach; thus data must be representative of the actual frequency <br /> <br />V-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.