Laserfiche WebLink
<br />735.00 <br /> <br /> <br />/- . . I" <br /> FLOOD RELATED COSTS <br /> 5/10/84 THROUGH 6/30/84 <br /> Previously Additional Projected Totals <br /> Submitted Costs <br />.--. <br />F.p.1ployee Labor <br />Overtime & Temporary <br />7% FICA 7339.67 <br /> 513.78 <br />Police Overtime 2289.85 <br />Maintenan~ 2623.30 2310.00 <br />7% FICA 183.63 197.00 <br /> Sub Total 7853.45 5096.78 3007.00 15957.23 <br /> <br />Contracted Equipment & Labor <br /> <br />Morgan Excavating <br />Dick Wisecup <br />Terry Trout - Welding <br />Morgan Excavating <br />(Laying Temporary Pipeline) <br /> <br />Sub Total <br /> <br />2160.00 <br />200.00 <br /> <br />. 2360.00 <br /> <br />Construction - Replacement <br /> <br />... <br />D & D Consultants - Culverts <br />D & D Consultants - Supplyline <br />Dodson - Coupling - Tempor- <br />ary line <br />Dodson - Pipe <br />Pierce - Ells <br /> <br />612.80 <br />2554.25 <br />1446.77 <br /> <br />" <br /> <br />" <br /> <br />" <br /> <br />" <br /> <br />Sub Total <br /> <br />4613.82 <br /> <br />1iscellaneous <br /> <br />Sand Bags MJK Feed <br />Sand MPM <br />Tire Replcmnt Sinclair 131 <br />Weston Oil - Diesel Fuel <br />Gasoline Sinclair 131 <br />Transfer Case - 1981 Ford <br />(Damaged 5/14/84) <br /> <br />64,40 <br />39.80 <br />130,00 <br />2471.01 <br /> <br />Sub Total <br /> <br />2705.21 <br />$17532,48 <br /> <br />Grand Total <br /> <br />735.00 <br /> <br />3000.00 <br />3000.00 <br /> <br />6095.00 <br /> <br />36.00 <br />9890.00 <br />899.80 <br /> <br />10825.88 <br /> <br />-0- <br /> <br />15439.70 <br /> <br />1259.95 <br />53.55 <br />1020.00 <br />2333.50 <br />18991.16 <br /> <br />-0- <br />6007,00 <br /> <br />5038.71 <br />42530.64 <br />