My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06757
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06757
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:09:51 PM
Creation date
10/5/2006 2:29:57 AM
Metadata
Fields
Template:
Floodplain Documents
County
Alamosa
Community
Alamosa County
Stream Name
Rio Grande River
Basin
Rio Grande
Title
Alamosa Flood Control Project Phase I and II
Date
9/8/1986
Prepared For
Alamosa County
Prepared By
CWCB
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />b. Conduct linal inspection in the company of ENGINEeR, OWNER, and CONTRACTOR and prepare <br />a linallist of items to be completed or corrected. <br />c. Observe that all items on nnal list have been completed or corrected and make recommendations to <br />ENGINEER concerning acceptance. <br /> <br />C. Limitations of Authority <br /> <br />Resident Project Representative: <br /> <br />I. Shall not authorize any deviation from the Contract Documents or substitution of materials or equipment. <br />unless authorized by ENGINEER. . <br /> <br />2. Shall nol exceClI limilations of ENGINEER's authority as set forth in the Agreement or the General <br />Provisions to the Letter Agreement or the Contract Documents. <br /> <br />3. Shall not undertake any of the responsibilities of CONTRACfOR, subcontractors or CONTRACTOR's <br />superintcmJent. . <br /> <br />4. Shall not advise Oil, issue directions relative to or assume control over any aspect of the means, melhous. <br />techniques. sequences or prucedures uf construction unless such advice or directiuns are specifically <br />required by the Contract Documents. <br /> <br />5. Shall nol advise on, issue directions regarding or assume control over safety precautions and progr~.ns in <br />connection with the Work. <br /> <br />6. Shall not accept Shop Drawing or sample submittals from ar.yone other than CONTR: CTOR. <br /> <br />7. Shall nol authorize OWN ER to occupy the Project in whole or in part. <br /> <br />8. Shall not participate in specialized Held or laboratory tests or inspections conducted by others except as <br />sp~cincally authorized by ENGINl:.iR. <br /> <br />~~ <br /> <br />{The remainder ur this page was lert blank intentiunally.] <br />
The URL can be used to link to this page
Your browser does not support the video tag.