Laserfiche WebLink
<br />.5.3.2.2 <br />1. <br />2. <br /> <br />5.3.2.3 <br />1. <br /> <br />5.3.2.4 <br />1. <br />2. <br />3. <br />4. <br /> <br />5.3.2.5 <br />1. <br /> <br />3. <br />4. <br /> <br />someon.e rc.,) listen for additional alarm calls from the <br />gages .iln<l. report th6m. <br /> <br />Flood W.iltcher <br />Reads 'I:he staff gage. <br />Checks trouble spots upstream of the a~arm gage <br />wher.e l)bSI~rver infot1Jlation is inC:Omplete. <br />Relays reports to we Flood Coordinator. <br />Should h,a'l/e a 4 wheel-drive veh:i.clE' to get to gages <br />during :storms. <br /> <br />2. <br /> <br />Observel:-s <br />Take rilinfall readings and chec):: on stream flooding <br />in the:l:r: clrea. <br />Call thE' Flood Coordinatclr or will respond quickly <br />when call.fld. <br /> <br />Flood Warni.ng Maintenance Specialist <br />Make,. U11rf' that the system is prc,perly maintained. <br />Carriell (lllt tests, drills and routine maintenance. <br />OrdeJ~s lO:pare parts and makes repa irs. <br />Deleqa1:es work when more help is needed. <br /> <br />2. <br /> <br />Flood Warning Receivers <br />Are called directly by alarm ga';les (shoUld include <br />the flood coordinator and the maintenance <br />spec;.aHlst.) . <br />Have their phone numbers prograllllllsd into the dialer. <br /> <br />5.3.2.6 Note1:hat one person can do more ':han one of the jobs <br />outlined above. <br /> <br />f.. MAINTENANCE <br /> <br />6. 1 Maintenanc'e PJan <br />Maintenance of the flood warning sys::em must be carried <br />out systematically, year after year, or the equipment will <br />1 ikely fail a1: 1I01lH~ point during a flooel. The llIaintenance <br />procedures can be divided into routine, semiannual tests, <br />winterization, spz'i:ng start-up, post-flood and long-term. A <br />maintenance 109 };,c,ok should be kept for theflc)od warning gage. <br /> <br />6.2 Routine Ma,int:fmance <br />6.2.1 When - ~Iontbly. <br /> <br />6.2.2 Tasks <br />1. Cheal, 1:he battery under load (s':,e b). Dialer will <br />ma1funct.J.on if the load voltage of the battery drops <br />belo\;' 4 Volts. The battery shoul~ be recharged when <br />it drops, below 5 volts under load. <br />2. As pa rt (> f. the battery load test: <br />a. Push dialer switch to disconnect position to <br />remc,ve the dialer from the phOnE! line. <br />b. Open the clean-out door. <br /> <br />24 <br />