My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06631
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06631
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:09:31 PM
Creation date
10/5/2006 2:25:12 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Flood Mitigation and Recovery Annex
Date
1/1/1995
Prepared For
New Hampshire
Prepared By
NH Office of Emergency Management
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />K. RECONSTRUCTION PLANNING WORKSHEET <br /> <br />. <br /> <br />Purpose <br /> <br />Identify opponunities for land use change and prepare a reconstruction plan for your <br />community's 1 DO-year floodplain. ' <br /> <br />Materials <br /> <br />. Base map <br />. Comprehensive plan, redevelopment plan, other plans, zoning maps <br />. Floodplain management ordinance <br /> <br />Steps <br /> <br />1. Using the information accumulated on the base map and handouts and your knowledge <br />of the community and its plans, identify opponunities for changes in land use and <br />structures in the floodplain that could improve safety from floods and achieve other <br />community objectives. List the planning opportunities on Planning Opportunities <br />Worksheets. <br /> <br />e <br /> <br />2, Draw a proposed reconstruction plan for the floodplain on an overlay of the base map. <br />Show land uses, transportation changes, design features and other relevant information. <br /> <br />3. Estimate how long you think it would take to complete and adopt a reconstruction plan <br />allowing for public hearings and full citizen participation. How long do you think it <br />will be before the damaged areas of your community are completely rebuilt? <br /> <br />Months for floodplain planning: <br /> <br />Years for reconstruction: <br /> <br />4, What problems did you have in preparing a reconstruction plan? List actions that the <br />community might take now to prepare for this task. <br /> <br />-. <br /> <br />tit <br /> <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.