Laserfiche WebLink
<br />review, the contact prints, maps and cross sections will be reviewed and checked. <br />The mapping contractor shall coordinate his operations to permit a reasonable and <br />rapid check of the work by the CWCB in order to assure that the accuracy and <br />quality of workmanship complies in all respects with the terms and provisions of <br />these specifications. <br /> <br />Upon completion of the contract, all materials and data used by the contractor for <br />preparing the topographic maps shall become the sole property of the contracting <br />agency. These materials and data shall include any and all negatives, diapositive <br />plates, survey notes, computations of the horizontal and vertical control network, <br />field ties for permanent monuments, and other pertinent materials. <br /> <br />VI. SELECTION PROCESS <br /> <br />The CWCB will select the firm deemed to be most highly qualified, based upon <br />an evaluation of the information submitted in the contract proposal related to the <br />following items: <br /> <br />A. Experience. Experience of your firm on previous projects comparable in <br />scale, size, land features, and other conditions to the above proposed work. <br /> <br />B. Equipment Owned by Bidder. Equipment your firm currently owns and <br />will use if awarded the contract. <br /> <br />C. Equipment Owned by Others. Equipment owned by others that your firm <br />would plan to use. <br /> <br />D. Supervisor. Name, professional registration, qualifications, and <br />experience of the individual who will be responsible for organizing, <br />planning, and supervising the work. <br /> <br />E. Personnel. Names, qualifications, and experience of personnel who will <br />perform the work. <br /> <br />F. Completeness of Proposal. <br /> <br />I. The horizontal and vertical ground control system and panel layout <br />proposed for the project shall be submitted with the proposal. <br /> <br />2. The methodology to be used for performing the photogrammetric <br />services shall be explained. <br /> <br />3. All required attachments shall be submitted with the proposal. <br />