Laserfiche WebLink
<br />Item Articles of Service ~ <br />6. Provide one set of field notes for all ground <br /> control and monument surveys, including: <br /> level notes, horizontal notes, and USGS <br /> and/or USC&GS vertical and horizontal <br /> control data used. Closures for vertical and <br /> horizontal surveys and any adjustments to <br /> these shall be clearly indicated. The cost of <br /> the ground control survey shall be included <br /> in this item. $ <br />7.* The cost of map compilation, and digital <br /> modeling shall be included in this item. $ <br />8. Provide digitized cross-section information <br /> for 10 cross-sections per mile as delineated <br /> on the penciled manuscript or contact prints. <br /> a. Provide one set oftabulated cross- <br /> section data. <br /> b. Provide two sets of data on 3112" <br /> HD disk with cross-section data in a <br /> format specified by the CWCB, <br /> which is basically the same as the <br /> HEC-2 program requirement. <br /> Cross-section data shall be obtained at the <br /> time ofthe map compilation from <br /> alignments shown on the contract prints or <br /> manuscript. $ <br />9. Provide two sets of finished mylar maps at a <br /> scale of 1 "=200' with 2' contours and with <br /> cross-section alignments shown on the final <br /> maps. $ <br />10. Provide 3 112" floppies with AutoCAD <br /> drawings of all sheets supplies in Item 9 in <br /> AutoCAD release 12 or release 13 format. <br /> The layers in the AutoCAD drawing shall be <br /> approved prior to delivery. $ <br />