Laserfiche WebLink
<br />Project Actions Include: <br /> <br />. Engineering and final design for the Weldona Mitigation Project, <br />. Land acquisition of approximately 70 acres for project. <br />. Construction of a channel and land formation to divert water along the northern and <br />western edge of Weldon a, <br />. Construction of a reinforced concrete box culvert (RCB) under Highway 144 near County <br />Road 9 west of Weldona, <br />. Construction of a channel from Highway 144 to the South Platte River. <br />. Improvements to the ditch on the south side of Highway 144 from the RCB to the railroad <br />trestle east of Weldona, including replacement of existing culverts to accommodate the <br />design flow, <br />. Minor drainage improvements within Weldona, including larger culverts under streets <br />and drives and cleaning oflocal drainage ways and ditches, due to silt buildup, <br />. Construction of concrete spillways at Riverside Canal and Weldona Ditch, <br />. Maintenance of culverts, drainage ways, and ditches due to silt buildup, <br /> <br />Potential Community Partners: <br /> <br />Morgan County Road and Bridge Department <br />WRC Engineering <br />Colorado Water Conservation Board <br />Public Service Company (equipment/relocating utilities) <br />US West Communications (equipment/relocating telecommunications) <br />Quality Water (equipment/relocating water lines) <br />Department of Local Affairs (CDBG #98-814) <br />Weldona School District (maintenance and vegetation class project) <br />Riverside Irrigation Company (planning) <br />Weldon Valley Ditch Company (planning) <br />USDNNatural Resources Conservation Service - Colorado State Office (Stuart N. Simpson) <br />(Recovery Vegetation Grants) <br />Country General Stores ( flood mitigation materials, discount coupons, display) <br /> <br />Potential Private Partners (Landowners): <br /> <br />Larry Christensen <br />Mary Linton <br />Barry and Michelle Covelli <br /> <br />20 <br />