Laserfiche WebLink
<br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />" <br /> <br />I <br /> <br />Reach <br /> <br />Arvada <br /> <br />2 <br /> <br />I <br />I <br />I <br /> <br />, <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /><. <br /> <br />I <br /> <br />Arvada <br /> <br />3 <br />Jeffco <br /> <br />TABLE VI-4 <br /> <br />PHASE A <br /> <br />PROBABLE ANNUAL DAMAGES <br />LEYDEN CREEK;' <br />(Dollars) <br /> <br />Des i gn Status Quo <br />Frequency w/lmprovements Grass-L i ned <br />2 $ 8,800 $ 10,800 <br />10 8,800 7,700 <br />100 8,800 0*,"" <br />2 37,100 31,700 <br />10 37,100 9,600 <br />100 37,100 o~"* <br />100 NA <br /> <br />VI-5 <br /> <br />TABLE V 1- 6 <br />NDr,STRUCTURAL STRATEGY COSTS <br /> <br />Tools <br /> <br />Nonstructural <br />Strategy <br /> <br />1. Evaluation of existing Flood Plain including <br /> <br />Monuments and Signs <br /> <br />2. Selective Flood Proo~ing for d <0.5 feet only <br /> <br /> <br />3< Flood Plain Regulations <br /> <br />4. Revise Building Codes and Subdivision Regulations <br /> <br /> <br />5. Develop Plan for Urban Area Renewal of Flood Plain <br /> <br /> <br />6, Early Warning System <br /> <br />7, Insurance and Publ ic Education <br /> <br /> <br />8. ReI ief and Rehabilitation <br /> <br /> <br />9. Minor Structural Modification: Bridges and Culverts <br /> <br /> <br />10. Parks, Recreation and Open Space <br /> <br /> <br />11. Evaluation on a Regular Basis <br /> <br />$ 2,OOO/Mile1 <br /> <br />2 <br />2,OOO/House <br /> <br />5,OOO/Entity3 <br />11 <br />8,OOO/Entity <br /> <br />15,OOO/Entity5 <br />6 <br />15,000 Total <br /> <br />6,000 Total7 <br />8 <br />10,OOO/Year <br />V . 9 <br />ar les <br />N/A10 <br />11 <br />10, OOO/Yea r <br /> <br />$ <br /> <br />8,000 <br /> <br />25,000 <br />700 <br /> <br />* Annual damages are estimated only for those alternatives investigated <br />in a particular reach. <br /> <br />** Damages in 100-year channels are considered under O&M. <br /> <br />Reach <br /> <br />R-l <br />R-2 <br /> <br />R-3 <br />R-4 <br />R-5 <br /> <br />TOTAL <br /> <br />L-l <br />L-2 <br />L-3 <br /> <br />TOTAL <br /> <br />Houses+ <br /> <br />TABLE VI-5 <br /> <br />STRUCTURES TO BE REMOVED FROM 100-YEAR FUTURE <br />FLOOD PLAIN TO ACHIEVE BUILDING-FREE FLOOD PLAIN <br /> <br />Single <br />Apa r tmen t <br />Uni ts1d:. <br /> <br />Mobile <br />Homes;' <br /> <br />Conmercial <br />Un i ts++ <br /> <br />Includes identification of flood plain in field using 2-man survey crew for <br />3 days; 6 signs; marking of cooperating buildings & fire hydrants; at $2000 <br />per mile. <br /> <br />2 <br />Estimate based on improving window wells and providing sand bags & related <br />barriers, plus check valves. <br /> <br />3 <br />Legal costs for setting up effective regulations enforcement, <br /> <br />Tota I Cas t <br />(Mi 11 ion $) <br /> <br />4 <br />Legal and engineering costs. <br /> <br />5 Urban planner & legal fees in conjunction with Federal agencies & city staff, <br />Costs per entity may vary with type of renewal plan. <br /> <br />2.2 <br />9.9 <br /> <br />6 <br />Engineering costs related to development of plan, designs, & implementation in <br /> <br />conjunction with District, State & Federal agencies. Work by City staff, <br /> <br /> <br />7 Setting up of citizens advisory committee, printing of pamphlets & new releases. <br />Actual costs of premiums not included but considered as an annualized damage cost. <br /> <br />46 <br />193 <br /> <br />539 <br />139 <br />2 <br /> <br />186 <br /> <br />34 <br />2 <br /> <br />19<0 <br />4.9 <br />0.1 <br /> <br />36.1 <br /> <br />8 <br />Planning and coordination with local civil defense agency, and preparing <br />plan of action, printing, & distribution to police & sheriff agencies. <br /> <br />9 For lOO-year bridge & culvert costs, see the Status Quo with Improvements <br />Al ternate. <br /> <br />124 (11 <br />Camp I exes) <br /> <br />6 <br /> <br />919 <br /> <br />34 <br />12 <br />1 <br /> <br />186 <br /> <br />124 <br /> <br />42 <br /> <br />1.2 <br />0.4 <br />0.04 <br /> <br />1.64 <br /> <br />10 <br />Not appl icable for cost. <br />sources with benefit/cost <br /> <br />Parks & open space would be funded by separate fiscal <br />ratio in excess of 1.0. <br /> <br />47 <br /> <br />,', Mobile homes assumed to be relocated at $500/each <br /> Average value is $35,000 per house. 11 <br />+ <br />.':..'~ Ave rage value is $25,000 per apartment unit, <br />++ Average value is $15,000 per commercial unit. <br /> <br />In conjunction w/UD & FCD, State CWCB staff, & natural hazards geographer on <br />consultant basis, Includes annual reports to local governments and det~iied <br />recommendat ions. <br />