My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06399
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:08:54 PM
Creation date
10/5/2006 2:13:59 AM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Buffalo Creek
Basin
South Platte
Title
Stream Channel Stabilization Techniques for the Buffalo Creek Reclamation Project
Date
8/20/1996
Prepared For
USFWS
Prepared By
Woodward-Clyde
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I . <br />I <br />I . <br />I <br />I . <br />I. <br />I <br />I <br />I <br />I . <br />II <br />II <br />I . <br />II <br />! I <br />I <br />I <br /> <br />EROSION !)ll!O <br /> <br />I <br /> <br />Cut ~gituclinal cballDel anchor slotS 4" <br />deep ;/nd 4" wide along eac:h side of the <br />, <br />installation to bury edges of matting, <br />whenever possible extend malling 2" - 3" <br />aboveithe crest of channel side slopes. <br /> <br />Begmbg at the downstream end and in the <br />cente~ of the chaDl1el, place the initial end <br />of the !fust roll in the anchor trench and <br />secure with fastellillg devices all' <br />intcrv3ls. Note: matting will initially be <br />upside dowtl in aDchor trench. <br /> <br />In I . . d- lis . <br />same m1ll1ller, position a ~acent TO m <br />ancho~ trench, overlapping the preceding <br />roll a ininimum of 3 p. <br />I <br />secuJ these initial ends of malS with <br />, <br />anchors at I' inteTllals, backfill and <br />COll1pB.ct soil. <br />I <br />, <br />. Unroll center strip of m1llling I1JlSlleam. <br />Stop at next check slot or terminal anchor <br />trenell. <br />I <br />. Unro~ adjacenl mats upstream in similar <br />fashion. maintaining 3" O1/erl8P. <br />I <br />I <br />Fold and secure all rolls of matting <br />, <br />SIlugly inlO all \laIISVerse check <br />slots. Lly mat in the bottom of the <br />s101 then fold bllck Ilgainst itself. <br />Anchor through both layers of mllt <br />all' intervals then backfill aDd <br />compact soil. Continue rolling all <br />mat ..tidths upstream to the next <br />check'slol Or terminal anchor <br />trench. <br />i <br /> <br />6keniate method for nonaitica1 <br />in"" n~tions: place two rows of anchors on <br />6" centers at 25' - 30' inleTllals in lieu of <br />excav3Ied check slolS. <br />, <br />I <br /> <br />Shingle-lap spliced ends by a minimum of l' <br />-..jib uPstream mar on top to preveilt <br /> <br />l'l'lifring by water or begin new rolls in a <br />check slot Anchor overlapped area by <br />placing two rows of anchors, l' apart on I' <br />interVals. ' <br /> <br />. <br /> <br />Place edges of outside mats in previously <br />excavued longitudinal slots, anchor using <br />presaibed staple panern, backfill. and <br />compacl soil. <br /> <br />. Anchor, fill and compact upstream end of . <br />mal in a 12" x 6" termiaaI trench. <br /> <br />. <br /> <br />Secure mar to grollIld Sl.Itface using U- <br />shaped wire sl8ples geotextile pins or <br />woodeD stakes. <br /> <br />. <br /> <br />Seed and fill D1rf reinforcement matting with <br />sail, if specified. <br /> <br />SoillillillJ if specified for D1rf reinforcemenL <br /> <br />. After seeding, spread and lightly rake 112" - <br />3/4" offine topsoil into the mal apeJtUIes to <br />completely fill mat thiclaiess. Use backside <br />of rake or odler flat implement. <br /> <br />. Spread topsoil using lightweight loader, <br />backhoe, or other power equipUlellt. Avoid <br />sharp tnms with equipment. <br /> <br />. Do not drive traeked or heavy eCjlJipmp.[J! <br />O1/er mat. <br /> <br />. Avoid any 1raflic over matting if loose or <br />wet soil conditiODS exisL <br /> <br />. Use shovels, nkes or brooms for fine <br />grading and touch up. <br /> <br />. Smooth out soil filling just exposiDg top <br />nelling of matrix. <br />
The URL can be used to link to this page
Your browser does not support the video tag.