Laserfiche WebLink
<br />. <br />I <br />I <br />,. <br />. <br />I <br />I <br />I <br />I <br />i I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br /> <br />EROSION Z).:&tJp <br /> <br />EROSION CONTROL BLANKETS AND MAlTING <br />.1XT NOTES <br /> <br />I <br />, <br />, <br />I <br />CODStnlctioa Specifications: <br />Site PteDaration <br />· Pn1Per site preparation is essential to <br />I <br />ensure complete contact of Ihe <br />prdtection matting wilh the soil <br />I <br />· T and shape area of installation. <br /> <br />. Remove all rocks, clods, vegetative or <br />o~r obstrUctions so that Ihe installed <br />blaink:el5, Or mats will have direct <br />I '.L <br />contaCt WI... Ihe soil. <br />I . <br />. Pr~ seedbed by loosemng 2" - 3" of <br />tOToil above final grade. <br /> <br />. 1Il<;O'Porate amendments, such as lime <br />ana fertilizer, into soilllccording 10 soil <br />tesk and Ihe seeding plan. <br /> <br />Seedi~ <br />Seed atea ~ blanket installation for <br />. r <br />eroston control and re-vegetlltion. Seeding <br />after Dlat installation is often specified for <br />turf reiluorcemenl appIicatiOllS. When <br />seeding prior 10 blanket installation, all <br />check slol5 and other areas disturbed during <br />, ._,,_L., <br />IDSliWlIuon must be reseeded. <br />Wh~ Isoil filling is specified, seed the <br />mattmg and the entire disturbed area after <br />installlltion and prior to filling the mat with <br />soil, <br /> <br />Anchorinc <br />U-shaP,ed wire staples., metal geotextile <br />stake plns or 1riangular wooden stakes can <br />be used 10 anchor m1lts to the ground <br />surface. Wire staples should be a minimum <br />of 11 ~uge. Metal stake pins should be <br />3/16" ~eter steel with a 11/2" stc:el <br />washer at the head of the pin. W'ue staples <br />8JId metal stake should be driven flush to <br />!he soil surlace. All anchors should be 6" - <br />18" long and have sufficiCl1t ground <br /> <br />penetration to resist PUUOUL Longer anchors <br />may be required for loose soils. <br /> <br />Insta1lation on SloDeS <br /> <br />. Begin althe top of the slope and <br />anchor ilS blanket in a 6" deep x 6" <br />wide lrench. BaclcfllI trench and <br />ramp earth fumly. <br /> <br />Unroll blanket downslope in Ihe direction of <br />the waleI flow, <br /> <br />. <br /> <br />. The edges of adjacent pararaIl rolls must be <br />overlapped 2" to 3- and be stapled every 3 <br />feet . <br /> <br />. WIleD blankets must be spiced. pla<:e ' <br />blankets end over end ( sbingIe style) with <br />6" overlap. Staple through overlllpped area, <br />approximately 12" apart. <br /> <br />. Lay blaDkets loosely and maintain dircc:t <br />conlaet with Ihe soil - do not stretch. <br /> <br />. Blankets shall be sllIpled sufficienlly to <br />anchor b!allket and maintain contact with <br />the soil. Staples shall be placed down the <br />center and staggered wilh the staples placed <br />along Ihe edges Sleep slopes, 1:1102:1, <br />require 2 staples per squaze yard. Moderale <br />slopes, 2:1 to 3:1, require 11/2 staples per <br />sqtJ'.re yard (1 staple 3' o.c.). Gentle slopes <br />require 1 staple per square yard. <br /> <br />In~tJillatioD in channels <br /> <br />. Dig initial anchor trench 12" deep and 6" <br />wide across Ihe channel at the lower end of <br />the project area. <br /> <br />. Excavate intermittent check slots, 6" deep <br />1llId 6" wide across Ihe chanuel at 2S' to <br />30' intervals along the channel <br />