Laserfiche WebLink
<br />'" <br /> <br />20 Permanent Operating Equipment <br /> Radio controlled gaging <br /> station, including <br /> power, transmitter <br /> and receiver 1 JOB LS 10000 <br /> Contingencies 25% 2500 <br /> Total 20 Feature 12500 <br />30 Planning, Engineering and Design 110000 <br />31 Construction Management 70000 <br /> TOTAL SETBACK LEVEE, FLOODWALL, <br /> AND BANK STABILIZATION 1500000 <br /> <br />ANNUAL COSTS <br /> <br />INTEREST: 8 3/4 percent X 1500000 <br />AMORTIZATION: 0.00002 X l500000 <br />o & M <br /> <br />= <br /> <br />l31250 <br />30 <br /> <br />- <br /> <br />Levee <br />Floodwall <br />Bank Stabilization <br /> <br />- <br /> <br />1560 <br />600 <br />110 <br />133550 <br /> <br />.. <br /> <br />= <br /> <br />total <br /> <br />. <br /> <br />. <br /> <br />. <br />