Laserfiche WebLink
<br />. .; <br /> Closure Structure <br /> Sheet piling with <br /> hinged steel doors 1 JOB LS 30000 <br /> Floodwalls <br /> Site Work <br /> Foundation work, <br /> Excavation, common l20 CY 2 180 <br /> Backfill 40 CY 3 100 <br /> Concrete <br /> Concrete, in place <br /> Formed 140 CY 500 70000 <br /> Cement 770 CWT 4 3080 <br /> Reinforcing steel 13500 lba 1 6750 <br />. Closure Structure <br />with fl8shboards 1 JOB L5 10000 <br /> subtotal 658335 <br /> Contingencies 25 " 166665 <br /> Total 11 Feature 825000 <br />16 Bank Stabilization <br /> Earthwork <br /> Site Work <br /> Clearing and <br /> grubbing 0 Acre 1100 275 <br /> Rehab existing stone <br /> tre/\tment 1 JOB L5 10000 <br /> Riprap slope treatment <br /> Gravel bedding 1425 Ton 15 21375 <br /> RJ.prap 2500 Ton 22 55000 <br /> subtotal 86650 <br /> Contingencies 25% 20850 <br />. Total 16 Feature lO7S00 <br />