My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06286
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD06286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:08:30 PM
Creation date
10/5/2006 2:09:24 AM
Metadata
Fields
Template:
Floodplain Documents
County
Yuma
Community
Yuma
Stream Name
Republican River
Basin
Republican
Title
Master Plan of Drainage Facilities Yuma
Date
10/1/1975
Prepared For
Yuma
Prepared By
Parker & Associates
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ditch and road crossing will drain the general area north of <br /> <br />the airport including the north area of the airport and convey <br /> <br />it to a pond located generally north of the eastwest runway. <br /> <br />Designed storage for the pond is approximately l. 9 acre feet, <br /> <br />with a proposed 18" drain and an open swa1e draining the pond <br /> <br />to the east. Estimated costs are provided in the financial sec- <br /> <br />tion of this report for the pond, ditches, and right-of-way <br /> <br />across private property. <br /> <br />11. AIRPORT SOUTH AREA (AREA NO. 11) <br />It is proposed to drain the southern half of the airport with an <br /> <br />open ditch across country generally to the south end of the <br /> <br />north-south runway eliminating ponding within that area. The <br /> <br />open ditch will be constructed generally across country to <br /> <br />a point north of the east-west county road, daylighting along <br /> <br />the north side of the county road. Due to design capacities <br /> <br />and slope of the ditch, it is necessary to provide ditch checks <br /> <br />in this ditch to prevent unnecessary erosion. Costs estimates <br /> <br />are provided in the financial section of this report for the <br /> <br />ditch structures and ditch. <br /> <br />12. FUTURE IMPROVEMENTS <br /> <br />It is anticipated that a ponding area will be needed in the area <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.