Laserfiche WebLink
<br />field office facilities shall include all of th€~ Contractor's costs of what- <br />soever nature to mobilize and set up field office facilities. The price bid <br />shall include: furnishing, transporting, and inst.allinq field office <br />facilities; all permits; mobilizing for the proposed improvements; and any <br />other related and necessary materials, work, and equipment to mobilize and <br />provide field office facilities.. <br /> <br />Item No, 1000 OVEREXCAVATION FOR STABII.IZATION. ~'he measurement for <br />"-- <br />payment of this item shall be the total number of cubic yards of material <br />required to be excavated as outlined in t~hese specifications. <br /> <br />The unit price per cubic yard shall be the complet.e cost: of the Contractor to <br />perform the excavation. The price shall include: excavation, except rock <br />excavation, to the extent direct.ed by the Enq.ineer; disposal of excess exca- <br />vated materials in an approved location; replacement wit:h suitable backfill <br />material to provide a suitable foundation, includi.ng compaction, and any <br />related and necessary materials I' work and equipment required to accomplish the <br />over excavation and replacement of gra.nular Incrteria.l as required. <br /> <br />Item No. 1001 and 1002 FURNISH AND INS~~I\I,I, SELECT AND CJ~ASSIFIED <br />BACKFILL MATERIAL, The measurement :Eor payment of this time shall be the <br />total number of cubic yards in place of backfill In3.terial required to complete <br />the work, <br /> <br />The unit price per cubic yard shall be the complet.e cost~ of the Contractor to <br />furnish and install backfill m.at:erial. '1lhe price shall include: excavation, <br />haul, placement and compaction of the backfill material, and any related and <br />necessary material, work and equipment required to accomplish the placement of <br />backfill material. <br />