My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06073
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD06073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:07:47 PM
Creation date
10/5/2006 1:59:00 AM
Metadata
Fields
Template:
Floodplain Documents
County
Ouray
Community
Ouray
Stream Name
Cascade Creek
Basin
Gunnison
Title
Contract Documents for Debris and Flood Control Improvements Cascade Creek, Phase II
Date
5/10/1984
Prepared For
Ouray
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />field office facilities shall include all of th€~ Contractor's costs of what- <br />soever nature to mobilize and set up field office facilities. The price bid <br />shall include: furnishing, transporting, and inst.allinq field office <br />facilities; all permits; mobilizing for the proposed improvements; and any <br />other related and necessary materials, work, and equipment to mobilize and <br />provide field office facilities.. <br /> <br />Item No, 1000 OVEREXCAVATION FOR STABII.IZATION. ~'he measurement for <br />"-- <br />payment of this item shall be the total number of cubic yards of material <br />required to be excavated as outlined in t~hese specifications. <br /> <br />The unit price per cubic yard shall be the complet.e cost: of the Contractor to <br />perform the excavation. The price shall include: excavation, except rock <br />excavation, to the extent direct.ed by the Enq.ineer; disposal of excess exca- <br />vated materials in an approved location; replacement wit:h suitable backfill <br />material to provide a suitable foundation, includi.ng compaction, and any <br />related and necessary materials I' work and equipment required to accomplish the <br />over excavation and replacement of gra.nular Incrteria.l as required. <br /> <br />Item No. 1001 and 1002 FURNISH AND INS~~I\I,I, SELECT AND CJ~ASSIFIED <br />BACKFILL MATERIAL, The measurement :Eor payment of this time shall be the <br />total number of cubic yards in place of backfill In3.terial required to complete <br />the work, <br /> <br />The unit price per cubic yard shall be the complet.e cost~ of the Contractor to <br />furnish and install backfill m.at:erial. '1lhe price shall include: excavation, <br />haul, placement and compaction of the backfill material, and any related and <br />necessary material, work and equipment required to accomplish the placement of <br />backfill material. <br />
The URL can be used to link to this page
Your browser does not support the video tag.