My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06073
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD06073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:07:47 PM
Creation date
10/5/2006 1:59:00 AM
Metadata
Fields
Template:
Floodplain Documents
County
Ouray
Community
Ouray
Stream Name
Cascade Creek
Basin
Gunnison
Title
Contract Documents for Debris and Flood Control Improvements Cascade Creek, Phase II
Date
5/10/1984
Prepared For
Ouray
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />sheeting; shoring and bracing; concrete footi.ngs; timbers; steel beams; <br />reconstructing existing foundati.on; excavation; backfill; repair of any damage <br />resulting from construction; and_ all other rE~lated and necessary materials, <br />work, and equipment required to provide -tempc1rary and/or permanent protection <br />for existing structures. <br /> <br />Item No. 105 DIVERSION OF STREAM, No quantity measurement will be made <br />for any materials or work required to complet.e this item in place. The lump <br />sum price bid for this item shall include all of the Contractor's cost.s of <br />whatsoever nature. The price bid shall inclu.de: pumping and/or piping; sand- <br />bagging; miscellaneous cancre.te; pro1:ection of existing facilities; repair of <br />any damages resulting from water divl~rsion; a.nd all other related and <br />necessary materials, work, and E~quiprnent required to divert Cascade Creek. <br /> <br />Item 106 REMOVE REINFORCED CONCRETE TRANSITION. The measurement for <br />payment of this item will be .thE! total number of linear feet of reinforced <br />concrete transition removed, as measured along the centerline. The price bid <br />per linear foot of reinforced concrete remova.l shall include all of the <br />Contractor's costs of whatsoever nature requi.red for the removal of the rein- <br />forced concrete transition structure.. The unit price bid shall include: <br />excavation, but not rock excavat:ion; sheeting, shoring and bracing; concrete <br />sawing existing concrete in a manner satisfactory to the Engineer, removing <br />and disposing of the existing concrete transi.tion; surface rest.oration; and <br />any other related and necessary materials, work, and equipment required to <br />completely remove the reinforced concrete tra.nsition structure in accordance <br />with the Drawings and Specificat:ions.. <br /> <br />Item No, 200 EXCAVATION FOR UPPER DEBRIS RETAINMENT BASIN. The measure- <br />- - <br />ment for payment of this item will be the tot.al number of cubic yards of <br />material measured in cut requirE~d to be excaV'ated for construct:ion of the pro- <br />posed basin, or elsewhere on .the pro:ject; provided, however, no measurement <br />for payment will be made for exc:avat:lon resulting from careless or <br />unauthorized operations by the Contractor. <br /> <br />The unit price bid per cubic yard of excavation shall include all of thE! <br />Contractor's costs of whatsoever nature to p€~rform the e:xcavation. The price <br />bid shall include: excavation, except rock E!xcavation, to the extent shown on <br />the Drawings or Plans or as directed by the E:ngineer; placemen1: of excess <br />excavated materials in an approved location, including placement and compac- <br />tion in adjacent areas as indicated on the Dra.wings; and any o1:her related and <br />necessary materials, work, and equipment required to excavate the debris basin <br />or other portions of the project: in accordance with the Drawings and <br />Specifications. <br /> <br />Any excavation outside the limit:s shown on the Drawings shall be approved by <br />the Engineer, Payment for overexcavation sha.ll be the unit price per cubic <br />yard for excavation as computed above; provided, however, no measurement for <br />payment will be made for overexGavation outside the widths or depths directed <br />by the Engineer or as specified or excavation resulti.ng from careless or <br />unauthorized operations by the Contractor. <br /> <br />Item No. 201 ACCESS ROAD SURFACE. The measurement for payment of this <br />item will be the total number of linear feet of in place: access road; pro- <br />
The URL can be used to link to this page
Your browser does not support the video tag.