Laserfiche WebLink
<br />CITY OF OURAY, COLORADO <br />DEBRIS AND FLOOD CONTROL IMPROVEMEN'~S <br />CASCADE CREEK PHASE II <br /> <br />BID ITEM DESCRIPTIONS, MEASUREMEm~ AND PAYMENT <br /> <br />Payment shall be made only for "those items included in 1:.he Proposal. All <br />costs incurred shall comply with the provisions of theSE;! Specifications and <br />shall be included in the unit price bid for 1:he a8socia1:ed items in the <br />Proposal. Except as may be otherwise stipulated, no mat:erial, labor, or <br />equipment will be furnished by City. The basis of rneasuremen"t and payment for <br />each proposal item will be as &~scribed below: <br /> <br />Item No, 100 CLEARING AND GRUBBING. No quanitity measurement will be <br />made for any materials or work :required to co:mplet;e this item in place. This <br />work shall consist of clearing, grubbing, removing, and disposing of all vege- <br />tation and debris within the limits of the right-af-way and permanent easement <br />areas and such other areas as may be indicatE~d on the Drawings or required by <br />the work, except such objects as are designat:ed to remain or are to be <br />removed in accordance with other sect:ions of theSE! Specifications. This work <br />shall also include the preserva1:ion from injury or defacement of all vegeta- <br />tion and objects designed to remain. <br /> <br />Item No. 101 REMOVAL OF EXISTING CONCRE~rE FLUME. The measurement and <br />payment of this item will be thE> total number of linear feet of existing flume <br />required to be removed for cons1:ruct.ion of the proposed flume measured along <br />the centerline of the flume removed, The unit price hid per linear foot of <br />removal shall include all of the Cont:ractor' s costs of whatsoever nature for <br />removing the existing flume. The price bid shall include: excavation; remo- <br />val of surface materials; removing the ex:isti:ng flume; a.ll required tr.a.nspor- <br />tation of excavated materials; stockpiling the existing flume on site approved <br />by the City; protection of exis,t:ing facilities; disposal of debris and excess <br />excavated material; and all o.ther related and necessary materials, work, and <br />equipment required to remove "the existing flume in accordance w"ith the <br />Drawings and Specifications. <br /> <br />Item No. 102 and 103 REMOVE, M()DIF~ AND__REPL~CE EXISTIN0 BRIDGES. The <br />measurement for payment of this item will be the total number of bridges <br />removed, modified and replaced. The unit price bid per bridge shall include <br />all of the Contractor's costs of wha1:soever nature" The price bid shall <br />include: removal of existing bridge structure; storage; modifications as <br />shown in the drawings; construct.ion of concrete bearing surfaces; any barrica- <br />des, traffic control, and detour signs necess.:iry during construction; <br />rebuilding and compacting approach roadways; and all other related and <br />necessary materials, work, and E!quipment neceBsary to remove, modify and <br />replace the bridge. <br /> <br />Item No, 104 PROTECTION OF EXISTING STRUCTURES. No quantity measure- <br />ment will be made for any materials or work required to complet:e this item in <br />place. The lump sum price bid for this .item shall include all of the <br />Contractor's costs of whatsoever nature. The pricH bid will .include: <br />