Laserfiche WebLink
<br />OR~f1 <br /> <br />4. Basin W-5 - It may be possible with future <br />development of the river corridor to construct <br />a water quality structure just upstream of this <br />outlet to the Blue River. <br /> <br />5. Basin W-6 - A regional basin could be <br />located just above the start of the existing <br />42" RCP storm sewer. <br /> <br />6. Basin W-7 - A regional water quality <br />control structure could be constructed just <br />upstream of the 60" RCP storm sewer. <br /> <br />7. CUcumber Creek - If the construction of <br />the drainageway identified in the prioritized <br />improvements was performed, a water quality <br />control facility should be incorporated in its <br />design. <br /> <br />51 <br />