Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />c. <br /> <br />Citizen attitudes related to drainage, flood control, and <br /> <br />damage protection, and future development. <br /> <br />d. <br /> <br />Planning information on present and future development <br /> <br />pertaining to proposed flood control improvements. <br /> <br />e. <br /> <br />Existing drainage structures presently used in the major <br /> <br />drainage system. <br /> <br />f. Potential hazards due to flooding and physical entanglement <br /> <br />with existing utilities and topographic features. <br /> <br />g. <br /> <br />Review alternative improvements developed throughout the study <br /> <br />progress. <br /> <br />4. <br /> <br />Entities, agencies and individuals were contacted to obtain spe- <br /> <br />cific data: <br /> <br />a. City of Boulder <br /> 1) Exi st i ng drainage fac i 1 it ies <br /> 2) Exi st i ng ut i 1 it i es <br /> 3) Land use plans <br /> 4) Development trends <br /> 5) Floodplain regulations <br /> <br />b. <br /> <br />Boulder County <br /> <br />1) <br />2) <br />3) <br /> <br />Floodplain regulations <br /> <br />Emergency preparedness <br /> <br />Geology; estimated sediment size distribution <br /> <br />c. <br /> <br />Boulder Valley Publ ic Schools <br /> <br />l) <br /> <br />Emergency preparedness <br /> <br />2) <br /> <br />Information pertaining to proposed flood control im- <br />provements in the vicinity of Boulder High School. <br /> <br />d. <br /> <br />Colorado State Geologist <br /> <br />1) Sediment and erosion <br /> <br />2) <br /> <br />Existing geological conditions <br /> <br />e. <br /> <br />Colorado Department of Highways <br /> <br />1) <br />2) <br /> <br />Proposed 47th Street crossing <br /> <br />Review and comment concerning proposed <br />bridge improvements <br /> <br />f. <br /> <br />Federal Emergency Management Agency <br /> <br />1) Technical criteria relative to flood insurance regulation <br />and po 1 icy. <br /> <br />2) Review and comment concerning proposed improvements <br /> <br />g. United States Army Corps of Engineers <br /> <br />1) <br />2) <br /> <br />Previous studies <br /> <br />Review and comment concerning proposed improvements <br /> <br />h. <br /> <br />Private developers, realtors and interested individuals who <br /> <br />expressed knowledge concerning development within the Basin. <br /> <br />5. <br /> <br />The United States Army Corps of Engineers topographic mapping was <br /> <br />updated in the immediate vicinity of Boulder Creek by Bell Mapping <br /> <br />Company, Denver, Colorado, under a separate contract with Urban <br /> <br />Drainage and Flood Control District. <br /> <br />2 1 <br />