Laserfiche WebLink
<br />7) <br /> <br />HEC-2 computer print-outs for lOO-year existing condi- <br />tions, floodway listing for a one foot rise, multidis- <br /> <br />charge listing, and revised floodway computations. <br /> <br />Qualitative evaluation of debris problems. <br /> <br />8) <br /> <br />c. Floodplain and Floodway Maps <br /> <br />1) Map showing 100-year and 500-year floodplains, areas of <br />lOO-year floodplain where depths exceed two feet, and <br /> <br />areas of the 100-year floodplain where velocities exceed <br /> <br />two feet/second. (Set of 2l maps at l"=lOO'). <br /> <br />d. Engineering Design and CoSt Estimates <br /> <br />l) Plan maps of 50-, 100-, and 500-year excavated floodways <br />showing locations of levees, floodwalls, floodway <br /> <br />extremities, land ownership and other features. <br /> <br />2) Profile drawings of 50-, lOO-, and 500-year excavated <br />floodways showing water surface, levee and floodwall <br /> <br />heights, bridge elevations, and other features. <br /> <br />3) Quantity and cost estimates for 50-, 100-, and 500- year <br />excavated floodways. <br />4) Map showing structures to be demolished and rebuilt or <br />physically relocated under Plan II I. <br />5) Map showing structures to be flood-proofed or relocated <br />under Plan III. <br /> <br />e. Reports <br /> <br />l) Boulder Public Information Fact Sheet published April <br />1971. <br /> <br />20 <br /> <br />2) <br /> <br />I <br />I <br /> <br />Prel iminary draft report for Review Report for Water and <br /> <br />Related Land Resources Management Study, Metropolitan <br /> <br />Denver and South Platte River and Tributaries; Colorado, <br /> <br />Wyoming, and Nebraska; Part 10 Boulder Creek Boulder <br />, , <br />Colorado. <br /> <br />I <br />I <br /> <br />2. <br /> <br />Field trips were taken both within the basin and to other relevant <br /> <br />areas which identified the following' <br /> <br />a. Location, function and condition of existing drainage facilities. <br /> <br />I <br /> <br />b. Type, size, condition and activity of existing commercial, <br /> <br />agricultural and residential structures. <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />c. Basin environmental characteristics such as sediment size <br /> <br />distribution, variety and size distribution of existing <br />vegetat ion. <br /> <br />I <br /> <br />d. Basin physical characteristics such as existing utilities and <br />right-of-way limitations. <br /> <br />I <br /> <br />3. <br /> <br />I <br /> <br />Project meetings were held with representatives of all the entities <br />, <br />citizens groups, the UOFCD, Corps of Engineers, and Federal <br /> <br />Emergency Management Agency (FEMA) throughout the development stage <br /> <br />of this project, which provided valuable information concerning' <br /> <br />a. Documentation of historic flood experience within the Basin. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />b. Recognized and acknowledged problem areas and possible <br />solutions. <br /> <br />I <br /> <br />I <br /> <br />I <br />