Laserfiche WebLink
<br />3 <br /> <br />6. Time For Completion: Timely completion of tht?: work is an Lnportant con-- <br />sideration of the Contract. <br /> <br />The successful Bidder will be required to !:>.<'o8}n wor~, no la~~1~1an, <br />March 1, 1985 and will be required to satisfy the Owner of ability to <br />complete the work by April 30, 1985. <br /> <br />7. Submission Of Bid: Btds must be sealed aTul deposited vlith the Owner at: <br />its office prior to the advertised time fer receipt of bids. The ellv€~lope <br />must show the work "Bfd" and the Bidder's name. A Bidder may \vithdray,1 <br />his bid prior to the opening time, but not after the advertised time._ <br /> <br />8. Acceptance Of Bid: Promptly after opening -,::he Bids, the OtN,:ler ,.,ill <br />compile the Bid totals and return the Bid Guaranties for all but the <br />lowest three Bids. The Contract will be awarded within five days afte.r <br />opening. The Owner reserves the right to c:onfine consideration of the. <br />Bids to the base bid total. Thw Owner reserves the right to reject any <br />or all Bids, to waive any informality, and to award the Contract based <br />upon the lowest or best bid which serves the Owner's interest. The Ov.Tfler <br />may at his option, elect to award individu.al bid items. <br /> <br />9. Requirements For SuccE~ssful Bidder: <br /> <br />a. The successful Bidder must execute t-'IE: Agreement: included \vitldn <br />five days of the Notice of Award. <br /> <br />b. The successful Bidder will furnish at: his expense fully executed <br />copies of a Contractor's Performance Bond in the arnoun-t of thf~ <br />Contract Price within five days of t.v~\ Noti.ce of Award. <br /> <br />c. The successful Btdder will furnish the t'equisit" Certificates of <br />Insurance within five days of the Not,i.ce of Award. <br /> <br />10. Extra Work: The Contractor shall perform unforeseen work, Eor \vhich <br />there is no price included in the Contract, whenever it is deemed <br />necessary or desirable in order to complete fully the work as con- <br />templated. Such work shall be performed in a.ccordance with the <br />Specifications and as directed ~ and \o7i1l .Je paid for as provided under <br />Subsection 109.04 of the Colorado Departm'ml: of Highways Standard <br />Specifications. <br /> <br />11. Nondiscrimination In Employment: Work undex this Contract will obligatE~ <br />thE~ Contractor to not d-iscriminate in any employment practices" <br /> <br />12. Bi:.ght-Of-Way: The Owner's right-of-vlay i.s d..,.own on the Dra\vings, The <br />Contractor and his employees shall take care to confine their operations <br />to within the indicated r:Lght-of-way, <br />