Title
Floodplain Study Review and Designation program - SOQ
Date
4/1/2000
Prepared For
State of Colorado
Prepared By
Montgomery Watson
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />G. STEVE LOWRY <br /> <br />Page 7 <br /> <br />penstock and motorization of intake gates on the power canal. !\Ilr. Lowry assisted in plant <br />layout, site modifications, alignment of units and staI1-Up testing. <br /> <br />Resident Engineer for expansion studies on the Lusiwasi power plant in Zamiba. Performed <br />survey for addition of third penstock with 1700 foot head and initial layout of forebay and <br />expansion of the power canal. <br /> <br />Resident Engineer for field studies for a series of power generating dams on the Luapula <br />River in Zambia that would have a total capacity of 800 MW. Established two gaging <br />stations for flows up to 100,000 cumecs, organized an extensive test pit program, facilitated <br />the seismic and geological studies, assisted with a directional dlill program, and served as a <br />liaison between the client and local government agencies. <br /> <br />Cogeneration <br /> <br />Project Manager for construction oversight of the Wauna Mill Cogeneration Project in <br />nOlthwest Oregon for the Bonneville Power Administration (BPA). This project involved a <br />design/build contract for both a 35 MW steam turbine generator and a fluid bed hoiler, the <br />first of its kind in the United States. Mr. Lowry assisted BPA in review of project documents, <br />the construction schedule, and construction activities that might lead to cost or schedule <br />problems. <br /> <br />Wastewater <br /> <br />Project Engineer for Salt Valley Trunk Sewer project in Lincoln, Nebraska. Prepared final <br />design documents for the Phase I construction of a 78-inch diameter interceptor. The design <br />included a three barrel inveI1ed siphon across Antelope Creek. All pipe and structures were <br />lined with PVC to limit corrosion. The pipe material was RCP due to ground water <br />conditions and a 25-foot depth of cover. Provided services during bidding, construction <br />observation assistance, plant inspection services that covered the entire manufacturing and <br />testing process, and assistance with contract administration during construction. Prepared a <br />routing and sizing study for a future six miles of 48-inch to 66-inch relief sewer. Utilized the <br />HydraGraphics model for evaluating areas of surcharge in the existing system and selecting <br />size for the proposed system. <br /> <br />Project Manager for the Salt Valley Trunk Sewer, Phase IIA in Lincoln Nebraska. This is a <br />1.5 mile extension of the Phase I work. The design is to be completed in January 2000. The <br />line size is 78 inches. Alternative pipe matelials will include reinforced concrete pIpe, <br />prestressed concrete cylinder pipe, and centrifugally cast fiber reinforced pipe. Four <br />tunneling operations will be included to cross under local highways and Interstate 180. <br /> <br />Project Engineer for the completion of the Berkeley Interceptor rehabilitation project III <br />Denver, Colorado for the Metro Wastewater Reclamation District. This project included <br />sliplining, reconstruction, and replacement of an impOI1ant interceptor in noI1h Denver. <br />Several bores were completed under major roads and rail roads. Final record and facility <br />drawings were prepared in compliance with stringent criteria. <br /> <br />MOI\lTGOI\IIEi~Y IN,IlTSON ({JJ) <br />