Laserfiche WebLink
<br />. <br />o <br />o <br />. <br />o <br />o <br />() <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />. <br />o <br />. <br />o <br />o <br />o <br />. <br />" <br />.. <br />. <br />o <br />o <br />" <br />o <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br />. <br />. <br />. <br />. <br />. <br />G <br />G <br />G <br /> <br /> <br />Lake Las Vegas LOMR <br /> <br />0; Montgomery Watson evaluated the impacts of converting an <br />original fuse-plug spillway to an inflatable dam spillway for Lake <br />Las Vegas in Henderson, Nevada. Flood hydrographs of various <br />recurrence intervals up to the 1/2 Probable Maximum Flood <br />were developed and routed through the reservoir and over the <br />spillway. A recommended operating plan was developed for <br />the inflatable dam spillway, and Conditional Letter of Map <br />Revision documentation was prepared to request a modification of the <br />regulatory 1 OO-year water surface elevation in the lake. The rubber dam <br />and associated controls were installed in 1997 and has been operated <br />during several large storm events. <br /> <br />Location: <br /> <br />Lake Las Vegas Resort, Henderson, Nevada <br />1997 <br /> <br />Year Completed: <br />Client: <br />Contact: <br /> <br />Transcontinental Properties <br />Mr. Steve Weber <br />Transcontinental Properties <br />1605 Lake Las Vegas Parkway <br />Henderson, Nevada 89011 <br />(702) 565-7400 <br />Project Team Involvement: Chip Paulson - Project Manager <br /> <br />8 <br /> <br />CWCB FLOODPLAIN STUDY REVIEW AND DESIGNATION PROGRAM <br /> <br />MONTGOMERY WATSON <BJ) <br />