Laserfiche WebLink
<br />I <br /> <br />I <br />I <br /> <br />SECTION C - TENTATIVE IMPLEMENTATION SCHEDULE <br /> <br />I II <br /> <br />II <br /> <br />A tentative implementation schedule for this study is presented in <br /> <br /> <br />Figure-1. <br /> <br /> <br />This schedule is based on the budget range for the study, a timely <br /> <br /> <br />receipt by the consultant of the information provided by the client, and <br /> <br /> <br />an allowance of two weeks for review of the draft copy of the final report. <br /> <br /> <br />The starting date for the study is assumed to be September 1, 1979. <br /> <br /> <br />Should the date of the fully executed copy of the contract be different than <br /> <br /> <br />the above stated date, the implementation schedule presented in Figure-1 <br /> <br /> <br />will be adjusted accordingly. Water Resources Consultants, Inc. can begin <br /> <br />the study at an earlier date if it is desired by the Colorado Water Conserva- <br /> <br /> <br />tion Board, Boulder County, Weld County, and the Town of Erie. <br /> <br /> <br />We believe that the proposed four month period specified in the RFP is <br /> <br /> <br />realistic and see no problem in completing the study on schedule. Any delays <br /> <br /> <br />in the implementation of the study as scheduled, which are beyond the control <br /> <br /> <br />of the consultant, will be promp1y brought to the attention of the client. <br /> <br />II <br /> <br />II <br /> <br />II <br />II <br /> <br />II <br /> <br />II <br /> <br />II <br /> <br />II <br /> <br />II <br /> <br />II <br /> <br />II <br /> <br />II <br />II <br /> <br />I <br /> <br />-4- <br />