Laserfiche WebLink
<br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The residual debris after burning would be hauled to the County <br />landfills. These assumptions and the costs are outlined in <br />~ _,)\.[l~!Jgj.~....)\.. The total cost estimate for debris removal is <br />--,\';:::..~$2951000 lli1sed on 232 acres of streambed debris. This includes <br />l24, 50 for removal, 70,250 for contingencies and $10,000 for <br />legal preliminary boundary marking and inspection. <br />) <br /> <br />DEBRIS REMOVAL COST ESTIMATE <br /> <br />Uncompahgre River ............................. <br />North Fork of the Gunnison River .............. <br />Legal, Inspection and <br />Preliminary Removal-Area Flagging ............. <br /> <br />Total Cost for Debris Removal................. <br /> <br />$ 33,250 <br />$ 181,500 <br />$ 10,000 <br />$ 224,750 <br />$ 70,250 <br />$ 295,000 <br /> <br />Contingencies (30%) ........................... <br /> <br />Total Cost for Debris Removal................. <br /> <br />Cost estimates for the removal of sand and gravel bars and ~f <br />channelization were diviged._ into: l? immedi~:t:e{il1llUi,.~E;!~..t.,_J:~E!..<:!ge/\y:\""',R <br />damage sites; and, 2)( a comprehenslve channel1zatlon program'~ <br />Appendix B presents the emergency 'expen'drt'1T.r'e'g--"W'1IT'C'h-''Shottxd-be'-' <br />made for bank protection, upstream channelization and bed <br />stabilization to protect five (5) County bridges. The total <br />estimated costs for these improvements is $175,000. This cost is <br />based on immediate mitigation steps needed to prevent severe <br />damage to the bridge structures from future flooding. The cost <br />includes $131,500 for construction, $31,500 contingencies and <br />$12,000 for legal, survey, engineering and inspection. The <br />following is a breakdown of these costs: <br /> <br />IMMEDIATE CHANNELIZ)\.TION <br />COST ESTIMATES FOR BRIDGE PROTECTION <br /> <br />Construction cost for channelization and <br />bank stabilization for three bridges on <br />the Uncompahgre River ......................... $ <br /> <br />81,500 <br /> <br />Construction cost for channelization and <br />bank stabilization for two bridges on <br />the Gunnison and the North Fork of the <br /> <br />Gunnison Rivers ............................... $ 50,000 <br /> <br />Total Construction Cost ....................... $ 131,500 <br />Engineering, Surveys and Legal................ $ 12,000 <br />Contingencies (20%) ........................... $ 31,500 <br /> <br />Total Cost for Channelization and ............. $ 175,000 <br />Bank Protection <br /> <br />-3- <br />