My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05149
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:25 PM
Creation date
10/5/2006 1:17:39 AM
Metadata
Fields
Template:
Floodplain Documents
County
Delta
Community
Delta
Stream Name
Gunnison, Uncompahgre Rivers
Basin
Gunnison
Title
Cost Estimates for Removal of Debris, Bank Protection and River Training Along the Uncompahgre, Gunnison and the North Fork of the Gunnison Rivers
Date
1/1/1980
Prepared For
Delta County
Prepared By
Mt Highland Engineering
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The residual debris after burning would be hauled to the County <br />landfills. These assumptions and the costs are outlined in <br />~ _,)\.[l~!Jgj.~....)\.. The total cost estimate for debris removal is <br />--,\';:::..~$2951000 lli1sed on 232 acres of streambed debris. This includes <br />l24, 50 for removal, 70,250 for contingencies and $10,000 for <br />legal preliminary boundary marking and inspection. <br />) <br /> <br />DEBRIS REMOVAL COST ESTIMATE <br /> <br />Uncompahgre River ............................. <br />North Fork of the Gunnison River .............. <br />Legal, Inspection and <br />Preliminary Removal-Area Flagging ............. <br /> <br />Total Cost for Debris Removal................. <br /> <br />$ 33,250 <br />$ 181,500 <br />$ 10,000 <br />$ 224,750 <br />$ 70,250 <br />$ 295,000 <br /> <br />Contingencies (30%) ........................... <br /> <br />Total Cost for Debris Removal................. <br /> <br />Cost estimates for the removal of sand and gravel bars and ~f <br />channelization were diviged._ into: l? immedi~:t:e{il1llUi,.~E;!~..t.,_J:~E!..<:!ge/\y:\""',R <br />damage sites; and, 2)( a comprehenslve channel1zatlon program'~ <br />Appendix B presents the emergency 'expen'drt'1T.r'e'g--"W'1IT'C'h-''Shottxd-be'-' <br />made for bank protection, upstream channelization and bed <br />stabilization to protect five (5) County bridges. The total <br />estimated costs for these improvements is $175,000. This cost is <br />based on immediate mitigation steps needed to prevent severe <br />damage to the bridge structures from future flooding. The cost <br />includes $131,500 for construction, $31,500 contingencies and <br />$12,000 for legal, survey, engineering and inspection. The <br />following is a breakdown of these costs: <br /> <br />IMMEDIATE CHANNELIZ)\.TION <br />COST ESTIMATES FOR BRIDGE PROTECTION <br /> <br />Construction cost for channelization and <br />bank stabilization for three bridges on <br />the Uncompahgre River ......................... $ <br /> <br />81,500 <br /> <br />Construction cost for channelization and <br />bank stabilization for two bridges on <br />the Gunnison and the North Fork of the <br /> <br />Gunnison Rivers ............................... $ 50,000 <br /> <br />Total Construction Cost ....................... $ 131,500 <br />Engineering, Surveys and Legal................ $ 12,000 <br />Contingencies (20%) ........................... $ 31,500 <br /> <br />Total Cost for Channelization and ............. $ 175,000 <br />Bank Protection <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.