Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />- <br /> <br />PRELIMINARY COST ESTIMATE FOR CHANNELIZATION <br />UP STREAM OF CERTAIN BRIDGES ON THE <br />GUNNISON AND NORTH FORK OF THE GUNNISON RIVER <br /> <br />The cost for channelization, of the streambeds upstream <br />bridges, and bank stabilization, where the bank erosion <br />years has threatened the stability of bridge structures, <br />in the following tables: <br /> <br />from specific <br />in the last two <br />are estimated <br /> <br /> , UNIT TOTAL <br />DESCRIPTION QUANTITy PRICE PRICE * <br />Channelization upstream of <br />the G-50 Road bridge on the <br />Gunnison 1,000. cv $ 2/cv $ 2,000 <br />Bank protection with large 30/cv <br />anaular rock rin-ran 100. cv $ $ 3,000 <br />Setup and moving costs for <br />construction on this bridqe 1. Is $3,OOO/ls $ 3,000 <br />Channelization upstream of <br />the 3400 Road bridge on the <br />North Fork o,f the Gunn,ison 4,000. ,cv $ 2/cv $ 8,000 <br />Abutment protection by cv 80/cv <br />aabions 100. $ $ 8,000 <br />Bank protection with large cv 30/cv <br />anqular rock rip-rap 600. $ $ 18,000 <br />Setup and moving costs for <br />construction on this bridqe 1. Is $3,OOO/ls $ 3,000 <br />Misc. 1. l,s $5,OOO/ls $ 5,000 <br />Total cost for channelization and <br />bank stabilization for two bridges <br />on the Gunnison and the North Fork <br />of the, Gunnison Rivers $ 50,,000 <br /> <br />* For purposes of the cost estimate, assumptions were made about the <br />amount of material to be removed and the extent of necessary bank <br />stabilization. the assumptions were based on engineering experience <br />and inspection of each site. <br /> <br />B-2 <br />