Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PRELIMINARY COST ESTIMATE FOR CHANNELIZATION <br />UP STREAM OF CERTAIN BRIDGES ON THE <br />UNCOMPAHGRE RIVER <br /> <br />The cost for channelization, of the streambeds upstream <br />bridges, and bank stabilization, where the bank erosion <br />years has threatened the stability of bridge structures, <br />in the following tables: <br /> <br />from specific <br />in the last two <br />are estimated <br /> <br /> UNIT TOTAL <br />DESCRIPTION OUANTITY PRICE PRICE * <br />Channelization upstream of <br />the BRoad bridqe 2,000. cy $ 2/cy $ 4,000 <br />Abutment protection by 80/cy <br />Iqabions 100. Cy $ $ 8,000 <br />Bank protection with large 30/cy <br />anqular rock rip-rap 300,. cy $ $ 9,000 <br />Setup andmoying costs for <br />construction on this bridqe l. Is $3,000/ls $ 3,000 <br />Channelization upstream of <br />the 1700 Road bridqe 3,000. Cy $ 2/cy $ 6,000 <br />Abutment protection by <br />qabions 150,. Cy $ 80/cy $ 12,000 <br />Bank protection with large 30/cy <br />anqular rock rip-rap 3.50. cy $ $ 10,500 <br />Setup and moving costs for <br />construction on this bridge l. Is $3,000/ls $ 3,000 <br />Channelization upstream of 2/cy <br />the 1600 Road bridqe 3,000. Cy $ $ 6,000 <br />Bank protection with large <br />anqular rock rip-rap 400. Cy $ 30/cy $ 12,000 <br />Setup and moving costs for <br />construction on this bridqe l. Is $3,000/1s $ 3,000 <br />Misc. l. Is $5,000/ls $ 5,000 <br />Total cost for channelization and <br />bank stabilization for three bridges <br />on the Uncompahqre River $81,500 <br /> <br />* For purposes of the cost estimate, assumptions were made about the <br />amount of material to be removed and the extent of necessary bank <br />stabilization. The assumptions were based on engineering experience <br />and inspection of each site. <br /> <br />B-1 <br />