Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PRELIMINARY COST ESTIMATE FOR <br />REMOVAL OF DEBRIS FROM THE <br />NORTH FORK OF THE GUNNISON RIVER <br /> <br /> UNIT TOTAL <br />DESCRIPTION QUANTITY PRICE PRICE <br /> , <br />Removal of debris from above <br />the 3400 Road bridge; debris <br />deposit is light density <br />scattered deposits and <br />Door access 2. ac $ 750/ac $ 1,500 <br />Setup and moving costs for <br />this river section l. Is $1,500/1s $ 1,500 <br />Removal of debris from above <br />the Highway 92 bridge; debris <br />deposit is medium to heavy density <br />large deposits and <br />qood access 190. ac $ 750/ac $142,500 <br />Setup and moving costs for <br />this river section l. Is $5,000/ls $ 5,000 <br />Removal of debris from above <br />the P Road bridge; debris <br />deposit is 2-3 houses <br />:rood access l. ac $5,000/ac, $ 5.000 <br />Setup and moving costs for <br />this river section ,l. Is $ 500/1s $ 500 <br />Removal of debris from above <br />the Highway 187 bridge; debris <br />deposit is light density <br />scattered deposits and <br />fair access 2. ac $ 750/ac $ 1,500 <br />Setup and moving costs for <br />this river section l. Is $1,500/1s $ 1,500 <br />Removal of debris from above <br />the BRoad bridge; debris <br />deposit is light density <br />scattered deposits and <br />good access l. ac $ 750/ac $ 750 <br /> , <br />Setup and moving costs for <br />this river section l. Is $ 500/1s $ 500 <br />Misc. l. Is $10,000/ls $ 10,000 <br />Total cost for debris removal on the Uncompahgre River $ 33,250 <br /> <br />A-4 <br />