My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05149
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:25 PM
Creation date
10/5/2006 1:17:39 AM
Metadata
Fields
Template:
Floodplain Documents
County
Delta
Community
Delta
Stream Name
Gunnison, Uncompahgre Rivers
Basin
Gunnison
Title
Cost Estimates for Removal of Debris, Bank Protection and River Training Along the Uncompahgre, Gunnison and the North Fork of the Gunnison Rivers
Date
1/1/1980
Prepared For
Delta County
Prepared By
Mt Highland Engineering
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PRELIMINARY COST ESTIMATE FOR <br />REMOVAL OF DEBRIS FROM THE <br />NORTH FORK OF THE GUNNISON RIVER <br /> <br /> UNIT TOTAL <br />DESCRIPTION QUANTITY PRICE PRICE <br /> , <br />Removal of debris from above <br />the 3400 Road bridge; debris <br />deposit is light density <br />scattered deposits and <br />Door access 2. ac $ 750/ac $ 1,500 <br />Setup and moving costs for <br />this river section l. Is $1,500/1s $ 1,500 <br />Removal of debris from above <br />the Highway 92 bridge; debris <br />deposit is medium to heavy density <br />large deposits and <br />qood access 190. ac $ 750/ac $142,500 <br />Setup and moving costs for <br />this river section l. Is $5,000/ls $ 5,000 <br />Removal of debris from above <br />the P Road bridge; debris <br />deposit is 2-3 houses <br />:rood access l. ac $5,000/ac, $ 5.000 <br />Setup and moving costs for <br />this river section ,l. Is $ 500/1s $ 500 <br />Removal of debris from above <br />the Highway 187 bridge; debris <br />deposit is light density <br />scattered deposits and <br />fair access 2. ac $ 750/ac $ 1,500 <br />Setup and moving costs for <br />this river section l. Is $1,500/1s $ 1,500 <br />Removal of debris from above <br />the BRoad bridge; debris <br />deposit is light density <br />scattered deposits and <br />good access l. ac $ 750/ac $ 750 <br /> , <br />Setup and moving costs for <br />this river section l. Is $ 500/1s $ 500 <br />Misc. l. Is $10,000/ls $ 10,000 <br />Total cost for debris removal on the Uncompahgre River $ 33,250 <br /> <br />A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.