My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05149
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:25 PM
Creation date
10/5/2006 1:17:39 AM
Metadata
Fields
Template:
Floodplain Documents
County
Delta
Community
Delta
Stream Name
Gunnison, Uncompahgre Rivers
Basin
Gunnison
Title
Cost Estimates for Removal of Debris, Bank Protection and River Training Along the Uncompahgre, Gunnison and the North Fork of the Gunnison Rivers
Date
1/1/1980
Prepared For
Delta County
Prepared By
Mt Highland Engineering
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />- <br /> <br />PRELIMINARY COST ESTIMATE FOR <br />REMOVAL OF DEBRIS FROM THE <br />UNCOMPAHGRE RIVER <br /> <br /> UNIT TOTAL <br />nESCRIPTION QUANTITY PRICE PRICE <br />Removal of debris from above <br />the 5th Street bridge: debris <br />deposit is light density <br />scattered deposits and 750/ac <br />aood access 9. ac $ $ 6,750 <br />Setup and moving costs for <br />this river section 1. Is $ .500/1s $ 500 <br />Removal of debris from above <br />~~e Highway 348 bridge: debris <br />eposit is light density <br />scattered deposits and <br />ooor access 8. ac $ 750/ac $ 6,000 <br />Setup and moving costs for <br />this river section l. Is $ 500/1s $ 500 <br />Removal of debris from above <br />the 1600 Road bridge: debris <br />deposit is light to medium density <br />scattered deposits and <br />aood access l. ac $ 750/ac $ 750 <br />Setup and moving costs for <br />this river section l. Is $ 500/1s $ 500 <br />Removal of debris from above <br />the 1700 Road bridge: debris <br />deposit is medium density <br />scattered deposits and <br />fair access 8. ac $ 750/ac $ 6,000 <br />Setup and moving costs for , <br />this river section l. Is $l,OOO/ls $ 1,000 <br />Removal of debris from above <br />the 4175 Road bridge: debris <br />deposit is light density <br />very scattered deposits and 750/ac <br />Inoor access 10. ac $ $ 7,500 <br />Setup and moving costs for <br />this river section l. Is $5,000/1s $ 5,000 <br />Misc. l. Is $10,000/ls $ 10,000 <br />Total cost for debris removal <br />on the North fork of the Gunnison River $181,500 <br /> <br />A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.